Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Frame  > construction steel frame  > metal frame material formed steel bulding pre-made hot selling at Benin

metal frame material formed steel bulding pre-made hot selling at Benin 

Price: 1000.0 USD 
Payment Terms: T/T,T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-182
Production Capacity: 10000 Ton/per Month
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Shipment by: Shipment: 20'GP, 40'GP, 40'...
Design& quote: We can make design and quot...
Means of Transport: Ocean,Ocean
Packing: sea worthy packing
Brand Name: HX
Service Offered: Design, fabrication, packin...
Welding standard: AWS D1.1

1. 200 worker in charge of overseas construction
2. Certification ISO9001: 2008, by BV France
3. Connection of steel structure: weld or bolt



1. Information for Steel building ( made of metal frame material ) :

Standard

ASTM , BS , DIN , GB , JIS

Material Grade

Q235 & Q345 ( S235JR & S355JR )

Dimensions

Yours requirements

Place Of Origin

Shandong China ( Mainland )

FOB Price

US $ 20 - 150 / Square Meter

Port

Qingdao

Minimum Order Quantity

100SQM

Supply Ability

1000 Ton / Tons per Month

Payment Terms

L/C ,T/T

Quality Control

The third party , SG S , ASIA INSPECTION all accept

Delivery Term

Within 20 days after signing contract

Packaging 

According yours requirement , usually bundle with steel strip

Delivery Container

20'GP , 40'GP , 40'HQ , 40'OT

Our Experience

Have exported for 13 years , clients from all over the world

 

 

2. Our products scope include:

Single layered light and MID-sized workshops and warehouses, Steel building ( made of metal frame material ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc

 

3. Project case- Uganda Steel Coil Processing Plant:

Detailed introduction

Project Description: 30x 120M

Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc

Time: Oct. 25, 2012

Location: Uganda

Description:

Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client' s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.

 

4. Trial Assemblies to ensure smooth erection of Steel building ( made of metal frame material ) on project site:

Our plant is fitted out with large working areas for major assembly work of steel structures and oversized built-up components

In order to ensure the optimal installation of the steel structures on-site, trial assemblies of various and unique steel pieces with complex geometry forming part of a built-up component, are performed in the plant prior to their delivery to site.  In addition to validating the quality of the design, the compliance with engineering parameters and fabrication accuracy, these trial assemblies add great value for the client since they mean potential time and cost savings with regard to installation work on site.

To successfully carrying out trial assemblies of large steel components, our fabrication complexes have been fitted out with large production areas and state-of-the-art equipment as well as measurement method, which are integrated in Tekla Structures 3D software, thus ensuring the quality control of its products.

 

5. Packaging & Shipping for Steel building ( made of metal frame material ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) Why should I build steel building using steel structure ?

Steel has the higher strength.

80% recyclable, Steel is the most recycled material in the world.

No warping, no cracking, no chemical treatments.

Stronger connection.

Lower transport costs due to lightweight frames.

Steel frames will not burn, fire proof.

Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.

Each steel structure is a independent engineered.

 

2) How difficult is it to install Steel building ( made of metal frame material ) ?

Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: