Gold Index: 116359
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service City: Binzhou Province/State: Shandong Country/Region: China (Mainland)
heavy structure formed 60x40 steel building pre-built produce for Cuba buyer
1-153
1. 200, 000 square meter of factory space 2. EPS sandwich panel( for wall, roof, floor) 3. Fully support in installation & guidance
2018-01-16
heavy structural steel fabrication formed metal building parts nice-designed
1-152
1. For big single steel parts, no need to pack2. EPS sandwich panel( for wall, roof, floor) 3. Installation: erection Drawing or Guide on Site
heavy structural fabrication formed steel ag buildings with CE sale to Ankara
1-151
1. Mainly use: workshop, warehouse, office etc2. Surface processing: painted or galvanized3. Wall& roof: color steel board or sandwich panel
heavy steel structure fabrication formed large steel buildings muti-floor
1-150
1. Wall& roof panels: be packed by plastic film2. We design free dwg as per customers' request3. Branded and reputed consumables are used
2018-01-11
heavy steel structure formed medal buildings light-duty to Romania customer
1-149
1. 310+ Projects/ 40+ nations/ 300,000MT Export2. EPS sandwich panel( for wall, roof, floor) 3. QC:own high quality control or use third party
heavy steel structural fabrication formed steel buildings by ASTM steel
1-148
1. 40' OT is preferred to load the steel frame2. ISO9000, 14000, 18000 by BV France3. Building Type: warehouse, workshop, Agricultural
heavy steel structural fabrication formed steel bulding 2017 latest
1-147
1. 10 lines for steel frame produce, 960 worker2. Branded and reputed consumables are used3. Price from USD30 to 70/m2 as per customer order
Heavy Steel Frame Fabrication formed prefab steel garage damp proofing
1-146
1. Each Column be marked as per installation dwg2. Certification ISO14001: 2004, by BV France3. Lead Time: Within 20days after receive deposit
heavy Steel frame formed clearance steel buildings customized sale to Uruguay
1-145
1. Delivery time: strictly based on contract2. Engineers' guidance on-site is available 3. Structure connected with high intensity bolts