Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. warehouse solutions ( made of steel frame ) main components :
SIZE(m) | LENGTH * WIDTH * EAVE HEIGHT |
TYPE | SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN |
ONE FLOOR , TWO FLOORS , THREE FLOORS | |
BUILDING FOUNDATION | STEEL FOUNDATION WITH ANCHOR BOLTS |
COLUMN & BEAM | MATERIA L :Q235B & Q345B |
BRACING | X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc |
Wall & Roof C or Z PURLINE | SIZE :C120 ~ C320mm ; Z100 ~ Z300mm |
WALL & ROOF PANEL | SINGLE CORRUGATED STEEL SHEET |
SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc | |
WINDOW & DOOR | PVC or ALUMINIUM ALLOY WINDOW |
ELECTRIC ROOL - UP DOOR | |
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET | |
SURFACE TREATMENT | HOT GALVANIZED COATING COLD GALVANIZING |
Spray - Painting , Any color , or according to your request | |
ACCESSIORES | SEMI - TRANSPARENT SKYLIGHT BELTS |
VENTILATORS ; DOWN PIPE ; GUTTER | |
STANDARD BOLTS |
2. About our company:
1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.
2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.
3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.
3. Overseas projects we undertook in the last few years:
Industrial Warehouse(13000 m2)― Argentina
Warehouse(14000m2) , Republic of Uzbekistan
Workshop(12000m2) , Canada
Warehouse(3600m2) , Romania
Vegetable Market(2500m2) , Mauritius
Pig shed(3500m2) , USA
Chicken shed(2800m2) , Australia
Aircraft Hangar(1300m2) , Australia
Warehouse(900m2) , Mongolia
Prefabricated house(70m2) , 800 sets , Angola
Container house(20' ) , 60 sets , South Africa
4. The surface treatment for our warehouse solutions ( made of steel frame ) :
We have pretty good preservative treatment for steel frame as follows as per the highest international surface treatment code:
1) Clean the steel( reach to Sa2.5 Grade, China Code) , then we will spray paint:
Two layer epoxy zinc rich primer and 2 layer anti-rust paint( total thickness: 100-120um) ; Warranty period: 18-20 years under normal conditions.
2) Hot-dipped galvanized, when the thickness of parts is less than 5mm, thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.
5. Our seaworthy packing system for warehouse solutions ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of warehouse solutions ( made of steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the warehouse solutions ( made of steel frame ) ?
40% advance payment by T/ T, the balance before delivery.