Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. industrial steel framed buildings ( made of steel frame ) main components :
SIZE(m) | LENGTH * WIDTH * EAVE HEIGHT |
TYPE | SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN |
ONE FLOOR , TWO FLOORS , THREE FLOORS | |
BUILDING FOUNDATION | STEEL FOUNDATION WITH ANCHOR BOLTS |
COLUMN & BEAM | MATERIA L :Q235B & Q345B |
BRACING | X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc |
Wall & Roof C or Z PURLINE | SIZE :C120 ~ C320mm ; Z100 ~ Z300mm |
WALL & ROOF PANEL | SINGLE CORRUGATED STEEL SHEET |
SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc | |
WINDOW & DOOR | PVC or ALUMINIUM ALLOY WINDOW |
ELECTRIC ROOL - UP DOOR | |
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET | |
SURFACE TREATMENT | HOT GALVANIZED COATING COLD GALVANIZING |
Spray - Painting , Any color , or according to your request | |
ACCESSIORES | SEMI - TRANSPARENT SKYLIGHT BELTS |
VENTILATORS ; DOWN PIPE ; GUTTER | |
STANDARD BOLTS |
2. About us:
We are a modern steel structure building enterprise specialized in engineering design, manufacture, installation and service of steel structures; and its manufacturing base is situated in Shandong, China. Due to customers' trust and constant innovation of our team, the enterprise is now with a total area of 360, 000 m2 as regards our plants.
We have passed ISO9001: 2000 International Quality System Certification and has a level-one qualification of steel structure project specialized contracting. The enterprise has been verified by BV and SGS which are two global largest verification organizations.
The business scope of us are various steel building, such as steel structure workshop, warehouse, multi-storey building, prefab steel house, container steel house, high-rise frame building and frame structure for large equipment, etc. We also supply various steel structure materials, such as H-type steel, color steel sheet, C-type purlin, Z-type purlin, floor deck as well as steel beam and steel column.
3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :
The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .
Main steel structure: welded H steel;
Purlin: cold-rolled C section steel;
Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.
4. Fabrication Services for industrial steel framed buildings ( made of steel frame ) :
With the annual output of 200, 000 tons. We have 10 fabrication facility lines equipped with CNC cutting, drilling and milling capabilities. We are staffed with skilled CWI, production planning teams, and experienced steel structure building fabricators and painters. Each of our plants has its own unique strengths and assets, which makes us the optimal choice for any type of steel structure building project or heavy / complex steel structure.
5. Our seaworthy packing system for industrial steel framed buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Do you provide on-site installation service for industrial steel framed buildings ( made of steel frame ) ?
We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.
2) What' s your delivery time of your industrial steel framed buildings ( made of steel frame ) ?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.