1. Specifications for the industrial mezzanine building ( made of steel frame ) :
Items | Specification |
Length | Single slope , double slope , muti slope |
Width | Single span , double-span , Multi-span |
Height | single floor , double floors |
Column | Q235 , Q345 welded H section steel |
Beam | Q235 , Q345 welded H section steel |
Purlin | Q235 C channel or Z channel |
Knee brace | Q235 angle steel |
Vertical and traversal support | Q235 angle steel , round bar or steel pipe |
Tie bar | Q235 steel pipe |
Brace | Q235 round bar |
Cladding system | EPS , PU , Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation . available in Different colors & gauge |
Partition wall | sandwich panels ( EPS , PU , Fiber glass wool etc . ) available in Different colors & gauges |
Door | sandwich panel sliding door or roller door |
Gutter | stainless steel or color steel sheet |
Rainspout | PVC |
Live load on roof | In 120kg / Sqm ( Color steel panel surrounded ) |
Wind resistance grade | 12 grades |
Earthquake-resistance | 8 - 9 grades |
Structure usage | Up to 50 years |
Finishing options | vast array of colors and textures available |
Paint Options | Gray paint , red paint , white paint , epoxy zinc etc . Or Galvanized |
2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, industrial mezzanine building ( made of steel frame ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
3. Market covered:
Euro-market: German, England, French, Russia, Georgia
The American market: USA, Canada, Venezuela
Oceania market: Australia, New Zealand, Samoa
The Africa market: Angola, Algeria, Ghana
4. Hardware Advantage for industrial mezzanine building ( made of steel frame ) :
Factory I covers area of 253 mu( 168, 751SQM) , with 18, 000SQM of heavy structure workshop, 36, 000SQM of light structure workshop, 16, 000SQM of non-standard product workshop, 3000SQM of pre-fabricated piping workshop and 40, 000SQM of finished product stacking yard.
Factory II covers an area of 1000 mu( 667, 000 SQM), include 30, 000SQM heavy structure workshop( lifting capacity 200T) , 34, 000SQM non-standard product workshop, 34, 000SQM of enclosed painting workshop, 20, 000SQM of packing workshop and 30, 000SQM of finished product storage yard have been constructed.
Our heavy structure workshop of factory II is specially designed for fabricating all kinds of super heavy structure, the crane are equipped with max elevating capacity of 200MT.
5. Our seaworthy packing system for industrial mezzanine building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Q: How long is your delivery time for industrial mezzanine building ( made of steel frame ) ?
A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of industrial mezzanine building ( made of steel frame ).
2) Q: What is the colors of your sandwich panels usually used ?
A: Off-white, ivory white, blue, green and red color.
3) Q: How can I get the quotation of the project ?
A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.