Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Industrial Steel  > industrial metal fabrication  > steel mezzanine kits made of parede steel frame hot Sell to Niger customer

steel mezzanine kits made of parede steel frame hot Sell to Niger customer 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-875
Production Capacity: 3000 Ton/per Week
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Surface Treatment: Shot blasting Painted by co...
Software used: PKPM Tekla STAAD-Pro
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Standard: American code European code...
Drawing Design: by client or by us by clie...

1. Steel structure component be in nude package
2. Main Steel: Q345, Q235, Q345B, Q235B etc.
3. With ISO9001, CE and SGS approval.

1. Data of the steel mezzanine kits ( made of steel frame ) :

Specification

Material :

Grade Q235 , equivalent to ASTM A36

Grade Q345 , equivalent to ASTM A572

Section :

Any product shape according to customer's requirements

Certification :

ISO quality system , Chinese GB50221 - 2001

Sand Blast :

SA 2.5 Sand blasting

Welding Technology :

Single level butt welding , fillet welding by electric arc welding , 

and Gas shielded welding

Surface treatment :

Hot dip galvanized , Epoxy zinc rich primer

Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02

Welding Testing

Ultrasonic Testing , X-ray Testing

Manufacturing Technology

Drilling , Cutting , Assembling , Welding , Rectification , Testing etc

 

 

2. About us:

Have you ever experienced Complicated & Tedious to communicate with many of different factories for your wide range products demand for your projects? Are you tired and bored with your suppliers after the order confirmed? No worries. We can help you to solve all these problems. You only need to sit in your office. All of the other things hand over to us.

We are one Stop Shop for all of your steel building materials. We offer various types of steel structure, steel building, workshop, steel warehouse etc at competitive price.

 

We have been in the building field for more than 10 years earned our reputation as one of the Chinese's leading suppliers of construction metal products. We mainly worked with the Developer, Contractor, Designer and the Architect. In the following famous projects we are all involved as VIP supplier: Shanghai World Expo, Shanghai Disney Resort, South Korean Hyundai Steel Project 2950T.

 

We have our own Design Team and Quality Control Center. You only need send us your projects' Plan drawings then we make the solutions for you.

 

3. Project case- Hunan Volkswagen CAR ACCESSORY CO., LTD( 2013) :

This project includes the processing workshop( 12500 m2) , end products storage( 3600m2) , and a logistics center. The main processing is 12m high, with 48m span. All steel parts including steel main frame,  secondary frame and cladding system are manufactured and supplied by us.

 

4. Hardware Advantage for steel mezzanine kits ( made of steel frame ) :

Factory I covers area of 253 mu( 168, 751SQM) , with 18, 000SQM of heavy structure workshop, 36, 000SQM of light structure workshop, 16, 000SQM of non-standard product workshop, 3000SQM of pre-fabricated piping workshop and 40, 000SQM of finished product stacking yard.

 

Factory II covers an area of 1000 mu( 667, 000 SQM), include 30, 000SQM heavy structure workshop( lifting capacity 200T) , 34, 000SQM non-standard product workshop, 34, 000SQM of enclosed painting workshop, 20, 000SQM of packing workshop and 30, 000SQM of finished product storage yard have been constructed.

Our heavy structure workshop of factory II is specially designed for fabricating all kinds of super heavy structure, the crane are equipped with max elevating capacity of 200MT.

 

5. Our seaworthy packing system for steel mezzanine kits ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Price Term: FOB, CFR or CIF.

Shipping seaport: Qingdao Seaport. For FOB, CFR or CIF price, please specify which exact model steel building you need, and tell us your design data so that we can calculate the steel building cost, local transport charges and sea freight.

 

2) Payment: Typically 30% by T/ T as deposit, balance by T/ T before shipment. Other payment way can be negotiated.

 

3) Delivery: for 10000 SQM steel warehouse, goods can be ready for shipment about 1-2 months after receiving deposit.

 

4) How can I get a price for your steel mezzanine kits ( made of steel frame ) ?

Please send us your drawing; we can according to your drawing give you one price.

Or, give us your design data, we will design and quote to you.

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: