Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Industrial Steel  > industrial metal fabrication  > industrial steel fabrication building made of steel light frame low cost

industrial steel fabrication building made of steel light frame low cost 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-876
Production Capacity: 8000 Ton/per Month
Delivery Date: 30 days
Top client Serviced: SIEMENS, American GE, FRANC...
Software used: PKPM Tekla STAAD-Pro
Service Offered: Design, fabrication, packin...
Means of Transport: Ocean
Packing: Components will be packaged...
Brand Name: HX
Standard: American code European code...
Drawing Design: by client or by us by clie...

1. Supply output: 300000Ton steel frame one year
2. Installation: erection dwg or Guide on Site
3. Materials are procured from reputed suppliers

1. Our excellent design team will design the industrial steel fabrication building ( made of steel frame ) for you . If you give the following information :

1 ) Data for design

   Wind speed ( KM /H )

   Snow load : ( KG / M2 )

   Rain load ( KG / M2 )

   Earthquake load if have

   Demands for doors and windows

   Crane ( if have ) , Crane span , crane lift height , max lift capacity , max wheel pressure and min wheel pressure !

 

2 ) Material quality

   Windows and doors quantity , size and location

   Roof and wall material , sandwich panel or corrugated steel sheet ( steel sheet can not heat insulation ) 

 

3 ) Type

    Size -- width , length , eave height and roof slope

   Single slope or double slope

   Single floor , double floor or multi floor

 

2. China Steel Structure Solution Leader :

310+ Projects/ 40+ Countries/ 300,000 MT Exported

American& European Certification System

We could fabricate all kinds of steel structure for industrial and civil fields, like Power Plant [ Incl. HRSG( NPP) & Ducts; ACC; Conveyor], Oil Gas & Chemicals, Metal & Mining, Commercial Building, steel workshop, high rise building, Theme Park, Modularization and Fireproofing, etc.

 

3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:

The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.

 

4. Hardware Advantage for industrial steel fabrication building ( made of steel frame ) :

Factory I covers area of 253 mu( 168, 751SQM) , with 18, 000SQM of heavy structure workshop, 36, 000SQM of light structure workshop, 16, 000SQM of non-standard product workshop, 3000SQM of pre-fabricated piping workshop and 40, 000SQM of finished product stacking yard.

 

Factory II covers an area of 1000 mu( 667, 000 SQM), include 30, 000SQM heavy structure workshop( lifting capacity 200T) , 34, 000SQM non-standard product workshop, 34, 000SQM of enclosed painting workshop, 20, 000SQM of packing workshop and 30, 000SQM of finished product storage yard have been constructed.

Our heavy structure workshop of factory II is specially designed for fabricating all kinds of super heavy structure, the crane are equipped with max elevating capacity of 200MT.

 

5. Our seaworthy packing system for industrial steel fabrication building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How do we cooperate on certain project ?  

Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.

Project details, Drawings for your project, Revised drawings, Transaction confirmation.

 

2) What is the delivery time of industrial steel fabrication building ( made of steel frame ) ?

Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.

 

3) What' s your Payment term for the industrial steel fabrication building ( made of steel frame ) ?

40% advance payment by T/ T, the balance before delivery.

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: