Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. How to build a metal warehouse ( made of steel frame ) , please check the following table :
Design Data ( important ) | live load on roof ( KN / M2 ) wind speed ( KM / H ) snow load ( KG / M2 ) if have |
Size ( important ) | width length height roof slope |
Type | single slope or double slope muti slope or single span single floor or two floors |
Inter column | 5m , or 6m …. |
Windows & Door | 1 . quantity 2 . size 3 . Location 4 . PVC or aluminum |
Column &Beam | straight cross-section OR Variable cross-section |
Roof & Wall Panel | 1 . Colorful corrugated steel sheet 0.326~0.8mm thick , YX25-210-840 ( 840mm wide ) 3 . sheet+glass fiber(thick 50mm~200mm) |
Purlin | 1 . C purlin 2 . Z purlin |
Accessories | Do you need the skylight belts , Ventilators,down pipe , out gutter etc ? |
Surface Treatment | Shot blasting with anti rust paint or hot dip galvanize |
2. About our company:
1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.
2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.
3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.
3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:
Main steel frame:
Steel beam & column: Q345, Welded H beam
Wind-resistant column: Q345, Welded H beam
Secondary frame:
Roof purlin: Z250*75*20*2.2
Ceiling purlin: C120*50*20*2.2
Wall purlin: C180*70*20*2
Tie bar: 102*2
Vertical & horizontal bracing: 20
Kneel-bracing: L504
Purlin bracing: Q235, 12
Sleeves tube: Q235, 32*2.5
Roof system:
Type V930 pu panel 0.5/100/0.6mm Pu panel
Wall system:
Type v930 panel 0.5/100/0.6mm Pu panel
This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.
4. Drawings & Quotation for the metal warehouse ( made of steel frame ) :
1) Customized design to welcome.
2) As long as you like, we can design and provide drawings for you. Just give the technical data and your demand, we will give you the best offer.
3) In order to give you an exactly quotation and drawings, please tell us the Length, width, eave height and local weather. We'll quote for you prompt.
5. Our seaworthy packing system for metal warehouse ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How to buy your ideal metal warehouse ( made of steel frame ) ?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.
2) What is the delivery time of metal warehouse ( made of steel frame ) ?
A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.
3) How to install after the goods arriving destination ?
A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4) Q: Does your steel building can only be used in residential building ?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.