Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Fill the Table below and Sent It to Us, to Get Your Free Proposal for long span building ( made of steel frame ) :
Your location | Country ________ State ________ City _______ Postal code ________ |
Size | Length ________ meter Width ________ meter Height ________ meter |
Storey | Storey number ________ |
Wind Load | ________ km / hour |
Snow Load | ________ kn / m² |
Anti - earthquake | ________ magnitude |
Roof Normal Payload | ________ kg / m² |
Brick wall needed or not | If needed , brick height ________ |
Thermal insulation if needed | If needed , EPS panel , PU sandwich panel Glass wool panel , Rock wool panel are optional . If needed , normal pre-painted steel tile will be used for your project . |
Crane if needed | If needed , _____ units , max lifting weight ____ tons ; max lifting height _____ m |
Storage Cargo condition | If additional requirement for anti-corrosive |
2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, long span building ( made of steel frame ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
3. Project case- Binzhou Tianhong Steel Structure Chemical Plant, 4500 tons:
We work as subcontractor fabricated Steel Structure for Chemical Plant, project including Detail Engineer Plan, Fabrication, Steel Structure including Equipment Platform, Pipe Bridge, Tank Structure, Steel Platform, Handrail, Ladder, we also supply the Grating and Stair Treads.
The steel structure with the advantage of quickly installation, all the steel structure fabricated in workshop and delivery to the project site for installation, connected by high strength bolt, fast and easy installation greatly shorten the construction time which reduce the costs, the whole structure is easy in maintenance, which can be used for more than 50 years.
1) Equipment Framework
Equipment Framework bear the Equipment, Framework Structure mainly welding H Steel.
2) Pipe Bridge
Pipe Bridge mainly support the pipe, truss structure, the Angle Steel and H section steel connected by welding or bolt, the structure divide upper booms,bottom booms, web member etc.
3) Steel Platform
Steel Platform is convenient for several equipment operation, Maintenance and repair.
4. DESIGN STANDARD& SOFTWARE for long span building ( made of steel frame ) :
Standard: America Standard, Australia Standard, England Standard, China Standard, etc.
Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.
5. Our seaworthy packing system for long span building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How to install long span building ( made of steel frame ) ?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no work teams, we can send our professional teams to install for you.
2) Storage Life of long span building ( made of steel frame ) ?
Reply: All steel structure frame life is more than 50 Years, all cladding sheets are about 20 Years.
3) How can you deal with deformation when welding ?
We select suitable welding method, material and sequence as specified material required.