Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116359

You are here: home  > Steel Buildings  > prefab steel buildings  > 100x60 metal building made of frame steel big-Span well welded for Uruguay

100x60 metal building made of frame steel big-Span well welded for Uruguay 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-428
Production Capacity: 3000 Ton/per Week
Delivery Date: usually as customers'order
Top client Serviced: SIEMENS, American GE, FRANC...
Specifications: Main Steel: Q345B, Q235B Co...
Installation: Provide full set of constru...
Means of Transport: Land
Packing: Components will be packaged...
Brand Name: HX
Main structure: Welded H section,Lattice st...
Quality Control: The third party, SGS, ASIA ...

1. Transport by container or bulk-cargo ship
2. Working reliability is higher
3. Design: to customer's requirement or we design

1. Typical Surface treatment for 100x60 metal building ( made of steel frame ) :

Surface Treatment

Hot dip galvanize 

Standard : JIS , DIN , ASTM B695 - 2000

Hot dip galvanizing hole cutting good looking on surface

Galvanizing process :

Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing →

Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product


Paint

1 . Primer paint one coat 20 - 30 um

2 . Middle paint two coat 40 - 60 um

3 . Finish paint one coat 20 - 30 um

Paint type : 1 . red primer  2 . zinc primer  3 . Alkyd primer

 

 

2. Our products scope include:

Single layered light and MID-sized workshops and warehouses, 100x60 metal building ( made of steel frame ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc

 

3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:

Main steel frame:

Steel beam & column: Q345, Welded H beam

Wind-resistant column: Q345, Welded H beam

Secondary frame:

Roof purlin: Z250*75*20*2.2

Ceiling purlin: C120*50*20*2.2

Wall purlin: C180*70*20*2

Tie bar: 102*2

Vertical & horizontal bracing: 20

Kneel-bracing: L504

Purlin bracing: Q235, 12

Sleeves tube: Q235, 32*2.5

Roof system:

Type V930 pu panel 0.5/100/0.6mm Pu panel

Wall system:

Type v930 panel 0.5/100/0.6mm Pu panel

 

This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.

 

 

4. DESIGN STANDARD& SOFTWARE for 100x60 metal building ( made of steel frame ) :

 

Standard: America Standard, Australia Standard, England Standard, China Standard, etc.

Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.

 

5. Our seaworthy packing system for 100x60 metal building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How to control the quality of your 100x60 metal building ( made of steel frame ) ?

a. quality of the design: think about possible problems in advance and provide a high quality design solution.

b. quality of the raw material: choose the qualified raw material from the top steel mill in China.

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

2) How to deal with quality problems of your 100x60 metal building ( made of steel frame ) ?

Warranty is 2 years. Within the warranty period, we will responsible for all quality problems caused by production.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: