Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Products description for the prefab steel garage ( made of steel frame ) :
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. China Steel Structure Solution Leader :
310+ Projects/ 40+ Countries/ 300,000 MT Exported
American& European Certification System
We could fabricate all kinds of steel structure for industrial and civil fields, like Power Plant [ Incl. HRSG( NPP) & Ducts; ACC; Conveyor], Oil Gas & Chemicals, Metal & Mining, Commercial Building, steel workshop, high rise building, Theme Park, Modularization and Fireproofing, etc.
3. Project case- Heavy Structure Steel Welding Fabrication for New Zealand, 5900 tons:
Port: Tianjin
Place Of Origin: China
Brand Name: HX
Model Number: OEM And Design
Application: Industrial Usage
Production: H beam, Purlin, Bracing, Bolts
Price: USD 1200 / Ton
Delivery Time: 86 Days
Price Condition: FOB Tianjin Port
Packaging Details: In Seaworthy Packing
Package Weight: 5900tons
4. The surface treatment for our prefab steel garage ( made of steel frame ) :
We have pretty good preservative treatment for steel frame as follows as per the highest international surface treatment code:
1) Clean the steel( reach to Sa2.5 Grade, China Code) , then we will spray paint:
Two layer epoxy zinc rich primer and 2 layer anti-rust paint( total thickness: 100-120um) ; Warranty period: 18-20 years under normal conditions.
2) Hot-dipped galvanized, when the thickness of parts is less than 5mm, thickness of hot-dipped gal is more than 65um; when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.
5. Our seaworthy packing system for prefab steel garage ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Q: How could I control the cost of building a prefab steel garage ( made of steel frame ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a prefab steel garage ( made of steel frame ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a prefab steel garage ( made of steel frame ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.