Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. components and materials of the meta office building ( made of steel frame ) :
Main structure | Welded H section , Lattice structure , Tubular column or beam , space frame etc |
Purlin | C Section Channel or Z Section Channel |
Roof Cladding | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil |
Wall Cladding | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse Brace | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Packing | Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or your drawing |
2. About us:
Our company is established in Shandong China, with 10 advanced production lines. We have over 1000 employee and around 80 experienced engineers, so we can offer you design, production, installation service at any time. So, we have enough ability and experience to do your project well. And we can also provide more solutions for customers.
Our product: meta office building ( made of steel frame ) , industrial steel structure, civil steel structure, steel high rise buildings, steel warehouse&workshop, steel hanger, etc
3. Project name: Pakistan Ceramic Tile Factory, 2015, 49050 m2:
Location: Pakistan
Area: 49050m2
Project time: the year of 2015
This workshop is used for ceramic tile production, all use steel frame with an area of 49050 m2. Main materials are as following:
Steel truss: Q345B
Column: Q345B
Roof & wall purlin: galvanized Z280X75X20X2.5
Horizontal bracing: 25 round steel
Wall cladding: corrugated steel sheet+glass wool+corrugated steel sheet
Roof cladding: corrugated steel sheet+glass wool, skylight panel, ventilator
Door: electric rolling door, electric sliding door
4. Payment Terms & Delivery for meta office building ( made of steel frame ) :
Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)
Delivery time: 15 to 40 days, usually as customers' order
Shipment: 20' GP, 40' GP, 40' HQ, or in bulk
5. Our seaworthy packing system for meta office building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Do you accept container loading inspection ?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
2) Whats the terms of payment and the shipment for your product of meta office building ( made of steel frame ) ?
A: We can accept the payment by T/ T, L/ C, but we suggest the T/ T, it will be convenient and fast for the order. For the shipment, we can send the goods by Sea. The customers also can choose their own shipping company.
3) What do you do for meta office building ( made of steel frame )?
We design, manufacture, install and service all kinds of steel structure building, steel workshop, steel warehouse etc.