Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Steel building ( made of steel pipe structures ) main components :
SIZE(m) | LENGTH * WIDTH * EAVE HEIGHT |
TYPE | SINGLE SPAN , DOUBLE SPAN , MULTI - SPAN |
ONE FLOOR , TWO FLOORS , THREE FLOORS | |
BUILDING FOUNDATION | STEEL FOUNDATION WITH ANCHOR BOLTS |
COLUMN & BEAM | MATERIA L :Q235B & Q345B |
BRACING | X or V TYPE BRACING MADE BY ANGEL STEEL , ROUND Bar etc |
Wall & Roof C or Z PURLINE | SIZE :C120 ~ C320mm ; Z100 ~ Z300mm |
WALL & ROOF PANEL | SINGLE CORRUGATED STEEL SHEET |
SANDWICH PANEL INSULATION WITH EPS , PU , ROCK WOOL etc | |
WINDOW & DOOR | PVC or ALUMINIUM ALLOY WINDOW |
ELECTRIC ROOL - UP DOOR | |
SLIDING DOOR BY SANDWICH PANEL OR SINGLE CORRUGATED STEEL SHEET | |
SURFACE TREATMENT | HOT GALVANIZED COATING COLD GALVANIZING |
Spray - Painting , Any color , or according to your request | |
ACCESSIORES | SEMI - TRANSPARENT SKYLIGHT BELTS |
VENTILATORS ; DOWN PIPE ; GUTTER | |
STANDARD BOLTS |
2. China Steel Structure Solution Leader :
310+ Projects/ 40+ Countries/ 300,000 MT Exported
American& European Certification System
We could fabricate all kinds of steel structure for industrial and civil fields, like Power Plant [ Incl. HRSG( NPP) & Ducts; ACC; Conveyor], Oil Gas & Chemicals, Metal & Mining, Commercial Building, steel workshop, high rise building, Theme Park, Modularization and Fireproofing, etc.
3. Project case- Congo Steel Sheet Making Factory project, 2016:
Project Overview:
Beam & Column structure with large span curved cellular rafters. Package included structural steel work, stairs, balustrading and steel decking.
Main Contractor: MAPA Group
Engineer: Five Consulting Engineers
Tonnage: 2800
Completion Date: 2016
Due to the tight schedule of this project, to save the time and improve the container delivery efficiency, we use our container stuffing equipment from Germany, which could make us finish one 40 feet container stuffing within 2 minutes. The client and owner are all surprised to see our container stuffing system. What is more important and make them amazing, the goods are 100% brand new and without any damage after reach to project site. This help the owner get many prize from the local government.
4. Trial Assemblies to ensure smooth erection of Steel building ( made of steel pipe structures ) on project site:
Our plant is fitted out with large working areas for major assembly work of steel structures and oversized built-up components
In order to ensure the optimal installation of the steel structures on-site, trial assemblies of various and unique steel pieces with complex geometry forming part of a built-up component, are performed in the plant prior to their delivery to site. In addition to validating the quality of the design, the compliance with engineering parameters and fabrication accuracy, these trial assemblies add great value for the client since they mean potential time and cost savings with regard to installation work on site.
To successfully carrying out trial assemblies of large steel components, our fabrication complexes have been fitted out with large production areas and state-of-the-art equipment as well as measurement method, which are integrated in Tekla Structures 3D software, thus ensuring the quality control of its products.
5. Packaging & Shipping for Steel building ( made of steel pipe structures ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) How can i get the quotation of the product of Steel building ( made of steel pipe structures ) ?
A:
(1) If you have drawing, we can give you our quotation according to your drawing.
(2) If you have no drawing, my company will make a layout drawing. After you make sure all details in the drawing is no problem, we will send our quotation according to the drawing.
2) Is your price competitive with other companies ?
A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
3) Do steel constructions harm the nature ?
Answer: Steel is 80% recycling material. So it does less harm to the nature compared with the other type buildings.