Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Technical specs for Steel building ( made of steel structure connection ) :
Specification | Structure type | Heavy steel structure |
Design standard | AISI / ASTM / BS / DIN / GB / JIS | |
Length | With customer's requirement | |
Width | Single span , double-span , multi-span | |
Height | With customer's requirement | |
Components | Bolt | Steel grade 45 |
Column | Q235B , Q345B welded H section steel | |
Beam | Q235B , Q345B welded H section steel | |
Tube | Steel Q235B , Q345B | |
High strength bolt | Cr 40 , 10.9S , 9.8S , galvanization | |
Sleeve | Steel Q235B , Q345B , galvanization | |
Purlin | Q235B C channel or Z channel , galvanization | |
Roof & Wall panel | Sandwich panels , Corrugated steel sheet , FRP sheet |
2. Why choose us:
1) Workshop covers an area of 200, 000 square meters;
2) Owning 10 professional production lines, annual output reaches 150, 000tons for all kinds of Steel building ( made of steel structure connection )
3) More than 80 senior & middle rank engineers; .
4) Products pass the approval of ISO9001, CE, ASME, CWI, SGS, BV etc;
5) Products have already exported to Philippines, Malaysia, Australia, the United States, Chile, the United Arab Emirates, Saudi Arabia, Russia, Niger etc more than 60 countries and regions.
3. Project case- Structural Steel Logistics Warehouse:
This logistics warehouse is constructed for Hidu, it' s located in Qingdao, China, total area is 40, 000m2.
Our company takes 22 days in total to finish the area of 20,000m2, it' s a miracle in this field of steel structure construction, and we got high reputation from our customer.
1) Roof use V760 type 0.6mm steel sheet with 75mm glass wool and attaching veneer.
2) Wall use V840 type 0.6mm steel sheet
3) Skylight panel on roof
4) Ventilator on roof
4. Hardware and capacity advantage for Steel building ( made of steel structure connection ) :
We are a comprehensive corporation established in Northern China, which integrates R&D, design, manufacturing and installation of steel structure, covers an workshop area of 200, 000 SQM.
The company has 2 production and processing base in Shandong province. We have a production capacity of designing, manufacturing, installation of various types of 200 thousand tons construction steel structure and 5 millions square meter sheets of all kinds. The company introduced from abroad the world-class professional production lines of steel structure, has the most advanced automatic H-beam production lines, pipe truss, box beam production line, CNC hydraulic punching after-cutting C and Z steel production line, hidden button roof, wall panels, metal sandwich panel production line, etc. can complete all kinds of light steel structure, heavy steel, high-rise multi-spatial structure steel products processing tasks of high quality and efficiently.
5. Packaging & Shipping for Steel building ( made of steel structure connection ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) Do you provide on-site installation service for Steel building ( made of steel structure connection ) ?
We provides customers with one-stop integrated steel building solution including installation and operation. We have 3 options for on-site installation according to the customer' s specific situation. Firstly, we offer installation instructions and installation video. Secondly, we assign the installation team for the project. Finally, we send professional engineer to guide the local installation team.
2) What' s your delivery time of your Steel building ( made of steel structure connection ) ?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.