1. How to build a space frame connections building ( made of steel frame ) , please check the following table :
Design Data ( important ) | live load on roof ( KN / M2 ) wind speed ( KM / H ) snow load ( KG / M2 ) if have |
Size ( important ) | width length height roof slope |
Type | single slope or double slope muti slope or single span single floor or two floors |
Inter column | 5m , or 6m …. |
Windows & Door | 1 . quantity 2 . size 3 . Location 4 . PVC or aluminum |
Column &Beam | straight cross-section OR Variable cross-section |
Roof & Wall Panel | 1 . Colorful corrugated steel sheet 0.326~0.8mm thick , YX25-210-840 ( 840mm wide ) 3 . sheet+glass fiber(thick 50mm~200mm) |
Purlin | 1 . C purlin 2 . Z purlin |
Accessories | Do you need the skylight belts , Ventilators,down pipe , out gutter etc ? |
Surface Treatment | Shot blasting with anti rust paint or hot dip galvanize |
2. Our products:
Steel structural warehouse building, workshop building, agricultural building( Horse / cattle barn, poultry house) , high rise steel building, heavy industrial steel structure building, car parking, steel structure aircraft hanger, prefab buildings, school, office building, truss roof warehouses, sandwich panel, corrugated steel sheet, C& Z section steel purlin, space frame connections building ( made of steel frame ) ) .
We can also supply different kind of doors and windows, cranes which is related to project.
3. Project case- Congo Steel Sheet Making Factory project, 2016:
Project Overview:
Beam & Column structure with large span curved cellular rafters. Package included structural steel work, stairs, balustrading and steel decking.
Main Contractor: MAPA Group
Engineer: Five Consulting Engineers
Tonnage: 2800
Completion Date: 2016
Due to the tight schedule of this project, to save the time and improve the container delivery efficiency, we use our container stuffing equipment from Germany, which could make us finish one 40 feet container stuffing within 2 minutes. The client and owner are all surprised to see our container stuffing system. What is more important and make them amazing, the goods are 100% brand new and without any damage after reach to project site. This help the owner get many prize from the local government.
4. We found international surface treatment system for the space frame connections building ( made of steel frame ) :
We got NACE 1 and 2 level certificate as per American standard.
We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.
5. Packaging & Shipping for space frame connections building ( made of steel frame ) :
1) Steel structure components will be packaged by steel pallet made by channel steel, and the end plate will be properly protected.
2) Sandwich panels will be covered with plastic film.
3) Bolts and accessories will be loaded into wooden boxes.
4) Each column & beam will be marked according to installation drawing.
6. FAQ:
1) Common type of the industrial building you supply ?
Portal frame is the usual type in the industrial workshop and warehouse shed, other types like lattice structure, space structure, etc also could be designed and manufacturer as per customers request.
2) What is the quality grade of the space frame connections building ( made of steel frame ) ?
Q345 is used for main steel structure, Q235 is used for secondary steel structure.
Also we could use international steel as per your demand if order qty is big enough.
3) How about the delivery time for your space frame connections building ( made of steel frame ) ?
Usually, within 30-45 days after the order confirmed, also depends on the fabrication quantity.