Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Warehouse  > steel warehouse construction  > warehouse storage facilities and steel warehouse construction light-duty

warehouse storage facilities and steel warehouse construction light-duty 

Price: 1000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-817
Production Capacity: 3000 Ton/per Week
Delivery Date: usually as customers'order
Top client Serviced: SIEMENS, American GE, FRANC...
Material Grade: Chinese Q235& Q345B ASTM A...
Surface Treatment: painted with international ...
Means of Transport: Ocean,Land
Packing: Components will be packaged...
Brand Name: HX
Certificates:: EN-1090 CE certificate, Ame...
Standard: American code European code

1. Exporte to Philippines, Malaysia, Australia
2. Building Type: warehouse, workshop, Agri
3. Design: to customer's requirement or we design

1. Description of warehouse storage facilities ( made of steel frame ) :

Steel structure building is a new type of building structure system , which is formed by the main steel framework linking up H-section , Z-section , and U-section steel components , roof and walls using a variety of panels and other components such as windows and doors . Steel structure building is widely used in warehouses , workshops , large factories , and so on .

Dimensions

Length

H-beam : 4000 - 15000mm

Thickness 

web plate : 6 - 32mm      

wing plate : 6 - 40mm

Height

200 - 1200mm

Color

according to customers

Main components

Main frame

H beam

Purlin

C or Z section steel purlin

Brace

Anchor , ordinary , high strength bolt

Bolt

Sandwich panel or steel plate

Roof & wall

PVC or aluminum alloy door

Door

Sliding or rolling door

Insulation panel

EPS , Rock wool , PU sandwich

Material

Q235B , Q345B China standard steel

Sheet

0.5mm or 0.6mm galvanized sheet

 

 

2. Who we are:

We are mainly specially steel structure construction company undertaking the design, fabrication, assembly, and after-sales service of various types of warehouse storage facilities ( made of steel frame ), civil construction, heavy steel structures, stadiums, industrial workshops and warehouse building, steel structures high-rise building.

 

Now we have 3 heavy steel production line, six light steel production lines, 3 H-beam secondary processing lines, and advanced digital-controlled multi-head cutting machine,automatic submerged arc welding machine, assembly machine, calibrating machines, full-automatic shot blasting machines, totaling 200 equipment or more.

 

3. Project case- Industry Prefabricated Steel building:

Argentina prefabricated steel workshop project was done in the year of 2013, finished installation in the year of 2014. Total area of this workshop is 5, 700 square meters. Main workshop size is 84X 60X 9m, totally 4 spans, 15m per span with one 3ton crane in each, lifting height of the crane is 6m. Two accessory houses on both sides of the main workshop.

 

4. What you can get from us for your demanded warehouse storage facilities ( made of steel frame ) :

1) Steel structure special designing and processing

2) EPS sandwich panel( for wall, roof, floor)

3) All construction & decoration materials &downpipe are strictly selected.

4) Designing & Installation drawings( in details)

5) Full support in installation technology & guidance

6) Engineers' guidance on-site in your place is available

7) Custom-made service is available

 

5. Our seaworthy packing system for warehouse storage facilities ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How do we cooperate on certain project ?  

Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.

Project details, Drawings for your project, Revised drawings, Transaction confirmation.

 

2) What is the delivery time of warehouse storage facilities ( made of steel frame ) ?

Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.

 

3) What' s your Payment term for the warehouse storage facilities ( made of steel frame ) ?

40% advance payment by T/ T, the balance before delivery.

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: