Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Warehouse  > steel warehouse construction  > warehouse structure and steel warehouse construction pre-made to Asia customer

warehouse structure and steel warehouse construction pre-made to Asia customer 

Price: 1000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-818
Production Capacity: 8000 Ton/per Month
Delivery Date: 20 days
Top client Serviced: SIEMENS, American GE, FRANC...
Standard: American code European code
Drawing Design: by client or by us by clie...
Means of Transport: Ocean,Land
Packing: Sandwich panels covered wit...
Brand Name: HX
Material Grade: Chinese Q235& Q345B ASTM A...
Surface Treatment: painted with international ...

1. 960 workers, including 50 engineers
2. Feature: Environmental-friendly, Recyclable
3. Products pass inspection from SGS, LIoyd's and BV

1. Fill the Table below and Sent It to Us, to Get Your Free Proposal for warehouse structure ( made of steel frame ) :

Your location  

Country ________ State ________ City _______

Postal code ________

Size  

Length ________ meter  Width ________ meter Height ________ meter

Storey  

Storey number ________

Wind Load  

  ________ km / hour

Snow Load  

  ________ kn / m²

Anti - earthquake  

  ________ magnitude

Roof Normal Payload  

  ________ kg / m²

Brick wall needed or not  

  If needed , brick height ________

Thermal insulation if needed  

  If needed , EPS panel , PU sandwich panel Glass wool panel ,

Rock wool panel are optional .

  If needed , normal pre-painted steel tile will be used for your project .

Crane if needed  

  If needed , _____ units , max lifting weight ____ tons ; max lifting height _____ m

Storage Cargo condition  

  If additional requirement for anti-corrosive

 

 

2. About our company:

1) We have a group of professional engineers, most of whom has more than 10 years' experiences in architecture field.

2) Established for more than ten years, our company has got a various of experiences in all kinds of steel structure& steel building design, manufacture, installation and so on. The work staffs have excellent skills. Some of them had helped customers to install the warehouse around the world.

3) We have the capacity of annually 200,000 tons steel structure. We also have possessed more than 300 sets of large precise and advanced processing equipment, including large gantry planning machines, automatic submerged arc welding machines, assembling machines, shot blasting machines and so on.

 

3. Project case- Hunan Volkswagen CAR ACCESSORY CO., LTD( 2013) :

This project includes the processing workshop( 12500 m2) , end products storage( 3600m2) , and a logistics center. The main processing is 12m high, with 48m span. All steel parts including steel main frame,  secondary frame and cladding system are manufactured and supplied by us.

 

4. What you can get from us for your demanded warehouse structure ( made of steel frame ) :

1) Steel structure special designing and processing

2) EPS sandwich panel( for wall, roof, floor)

3) All construction & decoration materials &downpipe are strictly selected.

4) Designing & Installation drawings( in details)

5) Full support in installation technology & guidance

6) Engineers' guidance on-site in your place is available

7) Custom-made service is available

 

5. Our seaworthy packing system for warehouse structure ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How long is your delivery time for warehouse structure ( made of steel frame ) ?

A: Generally it is within 15-30 days after get the deposit and final drawing, definitely according to quantity and your requirements of warehouse structure ( made of steel frame ).

 

2) Q: What is the colors of your sandwich panels usually used ?

A: Off-white, ivory white, blue, green and red color.

 

3) Q: How can I get the quotation of the project ?

A: If you have drawing, we can offer you the quotation as per your dwgs. If you have no design, Our engineer make your idea to real warehouse and will design some drawings for you to confirm. And then offer you a quotation under your material demand and drawing.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: