1. Information for storage buildings ( made of steel frame ) :
Standard | ASTM , BS , DIN , GB , JIS |
Material Grade | Q235 & Q345 ( S235JR & S355JR ) |
Dimensions | Yours requirements |
Place Of Origin | Shandong China ( Mainland ) |
FOB Price | US $ 20 - 150 / Square Meter |
Port | Qingdao |
Minimum Order Quantity | 100SQM |
Supply Ability | 1000 Ton / Tons per Month |
Payment Terms | L/C ,T/T |
Quality Control | The third party , SG S , ASIA INSPECTION all accept |
Delivery Term | Within 20 days after signing contract |
Packaging | According yours requirement , usually bundle with steel strip |
Delivery Container | 20'GP , 40'GP , 40'HQ , 40'OT |
Our Experience | Have exported for 13 years , clients from all over the world |
2. Our products scope include:
Single layered light and MID-sized workshops and warehouses, storage buildings ( made of steel frame ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc
3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:
1) AREVA Transformer Factory Project:
Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.
2) NEW ZEALAND Barns / Grain Warehouses:
light gauge steel structure with cold bended profiles.
3) BOLIVIA Cement Plant:
Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.
4) LDK Polysilicon Public Project:
Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.
4. We found international surface treatment system for the storage buildings ( made of steel frame ) :
We got NACE 1 and 2 level certificate as per American standard.
We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.
5. Our seaworthy packing system for storage buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How about the delivery time of the storage buildings ( made of steel frame ) ?
Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.
2) What makes you different from other manufacturers ?
We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, storage buildings ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.
3) Can I customize my storage buildings ( made of steel frame ) ?
Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.