Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116359

You are here: home  > Steel Structure  > steel structure fabrication  > steel a frame pre fab structures building British standard

steel a frame pre fab structures building British standard 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 2-048
Production Capacity: 3000 Ton/per Week
Delivery Date: Panel accessories will be p...
Top client Serviced: SIEMENS, American GE, FRANC...
Drawing Design: by client or by us
Shipment by: Shipment: 20'GP, 40'GP, 40'...
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Material Grade: Chinese Q235& Q345B
Surface Treatment: painted with JOTUN

1. QR code on Finished part to ensure quality
2. High quality welding process are used
3. Wide span: single or multiple span, max span 36m

1. Specifications of the Steel building ( made of steel a frame ) :

Main steel frame :

H section steel beam and columns

Secondary frame :

Galvanized C / Z purlin , steel bracing , tied bar , knee brace , edge cover etc .

Roof & Wall panel :

Sandwich panel , corrugated steel sheet or skylight panel

Tie Rod :

Circular Steel Tube

Brace :

Round Bar

Knee Brace :

Angle Steel

Roof Gutter :

Color Steel Sheet or galvanized Steel sheet

Rainspout :

PVC Pipe

Door :

Swing door , sliding door or roller door

Windows :

PVC steel or Aluminum Alloy Window

Connecting :

Anchor bolt , high-strength bolt , common bolt

Drawing :

We can make the design and quotation according to your requirement or your drawing

Installation :

Provide full set of construction drawings and video to direct installation ; Engineer are able to stay at site to direct construction

 

2. Company Brief:

Founded in Shandong, we are one of the most powerful enterprises of steel building and steel structure in China.

Area of Main factory: 360,000 square meters and the 200,000 square meters' workshops.

Total number of staff: 960 persons, details are as follow:

Number of Admin Staff: 140.

Number of Marketing and Sales: 102.

Number of Architectural Designers: 58

Number of In Line QC: 38.

Number of regular workers for production and installation of Steel building ( made of steel a frame ) : 600

We have the experience to do the big projects with the top rank construction company in the world, we are always showing our best service and professionalism, and we have exported the steel structure buildings to more than 110 countries.

 

3. Project case- West Chuang Company Steel Structure Workshop / Light steel structure warehouse:

1) Roof: Color-coated Corrugated Steel Sheet with skylight panel

2) Wall: Color-coated Corrugated Steel Sheet

3) Main Steel Framework: Steel Column, Beam, Purlin and other supporting parts with shot blasting and painting process.

4) Material: Q345

5) Window: Plastic Steel Window

6) Door: Sliding Door plus Canopy(all are made by sandwich panel)

7) PVC Downpipe

8) Total 3000tons

 

4. Certification for Steel building ( made of steel a frame ) :

We are always committed to the development of steel structure. By far we have achieved the following certificates:

CE EN1090 certification

Quality Management System Certification ISO9001: 2008, by BV France

Environment Management System Certification ISO14001: 2004, by BV France

Occupational Health and Safety Management System Certification, by BV France

CWI certificate

TWI certificate

ASME certificate

AWS welder certificate etc.

 

5. Packing & Delivery for Steel building ( made of steel a frame ) :

For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift

For cladding: Plastic film wrap the roof and wall corrugated single steel plate.

but for sandwich panel will load into container piece by piece

This package is to protect the goods from damage, during the transportation.

 

Delivery:

Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.

Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.

 

6. FAQ:

1) Why choose us ?

Because we are professional on the steel structure and steel building, and have the quality guarantee with the strength of design & installation.

 

2) How can we be sure of your products of " Steel building ( made of steel a frame ) " are with superior quality, as you promised?

One of the reasons for our good quality products of structural steel work is our quality inspection system which is the best of its kind.

 

3) Can you offer designing service for Steel building ( made of steel a frame ) ?

Yes, we have more than 89 design engineers. We could design full solution drawings as per your requirements. They use software: Auto CAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures( Xsteel) V16.etc.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: