Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Steel building ( made of steel fabrication work ) products description :
Dimensions | Length | H beam : 4000 - 15000mm |
Thickness | web plate : 6 - 32mm wing plate : 6 - 40mm | |
Height | 200 - 1200mm | |
Color | Depend on customers' needs | |
Advantages | 1 . Design according to customers' requirements | |
2 . Manufacture under complete quality control system --- ISO9001 | ||
3 . Installation with instruction of experienced engineers | ||
4 . Easy to assemble and dismantle | ||
5 . Eco-friendly material: can be used for several times and recyclable | ||
6 . Short construction period , long using time | ||
7 . High strength and stiffness , high weight bearing. | ||
8 . Sound insulation and heat insulation ; antisepsis and damp proofing ; waterproof and aseismatic | ||
Main components | Main frame | H beam |
Purlin | C or Z section steel purlin | |
Brace | Anchor , ordinary , high strength bolt | |
Bolt | Sandwich panel or steel plate | |
Roof &wall | PVC or aluminum alloy door | |
Door | Sliding or rolling door | |
Insulation panel | EPS , Rock wool , PU sandwich | |
Material | Q235B Q345B China standard steel | |
Sheet | 0.5mm or 0.6mm galvanized sheet |
2. Our products scope include:
Single layered light and MID-sized workshops and warehouses, Steel building ( made of steel fabrication work ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc
3. Project case- Argentina Wugan warehouse, 2012:
Description: This project comprises a high specification industrial unit, factory and warehouse for a company producing electronic systems for industry. The building features an integrated two storey office facility, composite panel wall cladding and a curved roof with a standing seam system, barrel vault roof lights and a 10t travelling crane.
The client choose us after visited 6 China suppliers, when they came to our factory, we are producing and delivering steel structure for 9 countries, more than 20 containers are stuffing for 4 countries. No need more words, seeing is believing!
4. The services that we can provide for Steel building ( made of steel fabrication work ) :
1) We have our own technical teams, so we can design, fabricate and install all kinds of steel structure building according to customers requirement.
2) It's very easy to install the steel structure building in your side according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
5. Packing & Delivery for Steel building ( made of steel fabrication work ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Can I have a visit to your factory before the order ?
A: Why not ? welcome to visit our factory. You can fly to Jinan Airport. We will pick you up in the airport. Hotel booking service is available.
2) Do you supply installation service for Steel building ( made of steel fabrication work ) ?
A: Yes, we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.
3) How long can the Steel building ( made of steel fabrication work ) be used ?
A: The use life of the main structure is the designed used life, that is 50-100 years( standard request of GB) .