Gold Index: 116359
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service City: Binzhou Province/State: Shandong Country/Region: China (Mainland)
prefab storage buildings and Industrial Structural Steel Workshop with ISO
1-748
1. Shipping depended on order quantity2. Low cost, easy and fast to build.3. Wide span: single or multiple spans, max span is 36m
2017-12-27
Prefab Steel workshop made of mild steel frame light-gauge to Nicosia customer
1-747
1. Components will be packaged by steel pallet 2. Resistant to 8-9 earthquake grades.3. Span:single span or multi span
Prefab steel warehouse made of steel stucture ISO9001 at South America area
1-746
1. Number of Architectural Designers: 58 2. Free to design architectural drawings for you;3. Structure connected with high intensity bolts
Prefab Steel Structure workshop made of light metal framing multi-functional
1-745
1. 960 workers, including 50 engineers2. Fast installation shorten construction time3. Products passed through strict quality checks
Prefab Steel Structure Warehouse made of steel pipe column with new material
1-744
1. 310+ Projects/ 40+ Countries/ 300,000 MT Exported 2. Dimensions: as per customer's requirments3. Branded and reputed consumables are used
prefab shops building made of mild steel frame heavy-duty deftly created
1-743
1. Customers or us specifying freight forwarder2. Low cost, easy and fast to build.3. Lead Time: Within 20days after receiving the deposit.
prefab shop packages made of estrutura steel frame well selling precisely cut
1-742
1. Pass the approval of ISO9001, CE, ASME, CWI, SGS, BV2. Span life: Up to 50 years.3. Surface processing: painted or galvanized
prefab shop buildings made of steel frame work hot Sell sale to Djibouti
1-741
1. Accessories packed& protected by plastic paper2. Resistant to 8-9 earthquake grades.3. Fully support in installation & guidance
prefab metal storage buildings made of structure light pre-made sale to Iraq
1-740
1. Windows protected by the bubble papers2. Low cost, easy and fast to build.3. High quality welding process are used