Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Products description for the prefab metal storage buildings ( made of steel frame ) :
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. Applications of steel structure:
Structural steel fabrication have become increasingly and widely used at the workshops, warehouse, prefab metal storage buildings ( made of steel frame ) and other industrial and civil architectures. For example, single-span and multi-span gantry light-frame structures, exhibition Hall, industrial steel frame, Office buildings, Garage, Multy-story building, Hanger, Agricultural storage, Logistic centers, and all kinds of steel construction, etc.
3. Project case- Binzhou Tianhong Steel Structure Chemical Plant, 4500 tons:
We work as subcontractor fabricated Steel Structure for Chemical Plant, project including Detail Engineer Plan, Fabrication, Steel Structure including Equipment Platform, Pipe Bridge, Tank Structure, Steel Platform, Handrail, Ladder, we also supply the Grating and Stair Treads.
The steel structure with the advantage of quickly installation, all the steel structure fabricated in workshop and delivery to the project site for installation, connected by high strength bolt, fast and easy installation greatly shorten the construction time which reduce the costs, the whole structure is easy in maintenance, which can be used for more than 50 years.
1) Equipment Framework
Equipment Framework bear the Equipment, Framework Structure mainly welding H Steel.
2) Pipe Bridge
Pipe Bridge mainly support the pipe, truss structure, the Angle Steel and H section steel connected by welding or bolt, the structure divide upper booms,bottom booms, web member etc.
3) Steel Platform
Steel Platform is convenient for several equipment operation, Maintenance and repair.
4. Professional technical and management team for prefab metal storage buildings ( made of steel frame ) :
1) Full solution for steel structure design. We can offer design as per your requirement for the steel building, like workshop, warehouse, high rise building, prefab metal storage buildings ( made of steel frame ) etc
2) Procurement and Manufacture for all material for prefabricated building
We have a professional procurement team to make sure all the materials are with good quality and all from China top steel mills. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
3) Site management & Installation supervision
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
5. Our seaworthy packing system for prefab metal storage buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Are you manufacturer or trader ?
We are manufacturer. Welcome to visit us at any time!
2) How can you avoid size error in supplying us the prefab metal storage buildings ( made of steel frame ) ?
We select international size error standards;
Use specified equipment to cut shear and rectify steel plate according to steel thickness;
Standard weld and installation order to lessen deformation.
3) What is the cost if we ask your engineers to assemble ?
Round-trip air tickets, eating, living, translation fee, visa fee and salary.
Our team include senior engineers with professor titles, first-class registered constructors, first-class registered structural engineers, first-class registered cost engineer, registered architect, American CWI engineer, EN TWI engineer, EN IWE welding engineer, American NACE painting engineer and various technicians with senior and medium professional titles.