Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. How to build a Prefab Steel Structure Warehouse ( made of steel frame ) , please check the following table :
Design Data ( important ) | live load on roof ( KN / M2 ) wind speed ( KM / H ) snow load ( KG / M2 ) if have |
Size ( important ) | width length height roof slope |
Type | single slope or double slope muti slope or single span single floor or two floors |
Inter column | 5m , or 6m …. |
Windows & Door | 1 . quantity 2 . size 3 . Location 4 . PVC or aluminum |
Column &Beam | straight cross-section OR Variable cross-section |
Roof & Wall Panel | 1 . Colorful corrugated steel sheet 0.326~0.8mm thick , YX25-210-840 ( 840mm wide ) 3 . sheet+glass fiber(thick 50mm~200mm) |
Purlin | 1 . C purlin 2 . Z purlin |
Accessories | Do you need the skylight belts , Ventilators,down pipe , out gutter etc ? |
Surface Treatment | Shot blasting with anti rust paint or hot dip galvanize |
2. Wide Fields of Steel Structure be used:
1) Industrial steel structure warehouse, Prefab Steel Structure Warehouse ( made of steel frame )
2) Steel workshop / hangar / garage
3) prefabricated steel structure shed, Exhibition Hall, Office buildings
4) Garage, Musty-story building, Agricultural storage
5) Logistic centers and all kinds of steel structure buildings etc
3. Project case- Qilu Petro-chemical Heavy Steel Workshop:
Size: 55000 square meter workshop, Single Span 39m, eave height 18m, mainly loading bear steel member over 100Ton, totally quantity of steel 6000Ton.
Steel Column: Q345B Four tube lattice column. Painted: 120um epoxy zinc painted.
Roof Structure: Q235B Pipe Truss Structure. Painted: 120um epoxy zinc painted.
Crane Beam: Q345B H section Steel Beam. Painted: 120um epoxy zinc painted.
Secondary Structure
Roof Horizontal Bracing: Q235B Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Wall X Cross Bracing: Q235B Double Angle Steel, Painted: three layer white color anti-rust Alkyd painted
Tie Beam: Q235B Welding Pipe, Painted: three layer white color anti-rust Alkyd painted.
Roof Purlin: Galvanized C section steel
Wall Purlin: Galvanized C section steel
Steel Rod: Galvanized Steel Rod.
Panel system
Roof: 0.5mm Single Color sheet
Wall: 0.5mm Single Color sheet
4. Professional technical and management team for Prefab Steel Structure Warehouse ( made of steel frame ) :
1) Full solution for steel structure design. We can offer design as per your requirement for the steel building, like workshop, warehouse, high rise building, Prefab Steel Structure Warehouse ( made of steel frame ) etc
2) Procurement and Manufacture for all material for prefabricated building
We have a professional procurement team to make sure all the materials are with good quality and all from China top steel mills. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
3) Site management & Installation supervision
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
5. Our seaworthy packing system for Prefab Steel Structure Warehouse ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of Prefab Steel Structure Warehouse ( made of steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the Prefab Steel Structure Warehouse ( made of steel frame ) ?
40% advance payment by T/ T, the balance before delivery.