Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Workshop  > Industrial Structural Steel Workshop  > prefab workshop kits and Industrial Structural Steel Workshop cost-saving

prefab workshop kits and Industrial Structural Steel Workshop cost-saving 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-752
Production Capacity: 3000 Ton/per Week
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Installation: Engineer are able to stay a...
Service Offered: Design, fabrication, packin...
Means of Transport: Ocean
Packing: sea worthy packing
Brand Name: HX
Certificates:: 1. ISO9000, ISO14000, ISO18...
Quality Control: The third party, SGS, ASIA ...

1. Delivery time: strictly based on contract
2. Material Standards: AISI, ASTM, BS, DIN, GB, JIS
3. AWS& EN welder, CE, ensure production quality

1. Technical specs for prefab workshop kits ( made of steel frame ) :

 

Specification

Structure type

Heavy steel structure

Design standard

AISI / ASTM / BS / DIN / GB / JIS

Length

With customer's requirement

Width

Single span , double-span , multi-span

Height

With customer's requirement

Components

Bolt

Steel grade 45

Column

Q235B , Q345B welded H section steel

Beam

Q235B , Q345B welded H section steel

Tube

Steel Q235B ,  Q345B

High strength bolt

Cr 40 , 10.9S , 9.8S , galvanization

Sleeve

Steel Q235B , Q345B , galvanization

Purlin

Q235B C channel or Z channel , galvanization

Roof & Wall panel

Sandwich panels , Corrugated steel sheet , FRP sheet

 

 

2. Our strength on the prefab workshop kits ( made of steel frame ):

1) Rich experience

Rich project experience in different area of different continents.

2) Professional design and R& D team

Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.

3) Advanced production equipment

We possess plenty of advanced production equipment for structure steel and cladding materials.

4) Quality control

Professional procurement team making sure all materials with good quality and are from China top steel mills.

Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.

Our factory operation under highest international standard, ensure the steel fabrication works with high technology.

 

3. Project case- Hunan Volkswagen CAR ACCESSORY CO., LTD( 2013) :

This project includes the processing workshop( 12500 m2) , end products storage( 3600m2) , and a logistics center. The main processing is 12m high, with 48m span. All steel parts including steel main frame,  secondary frame and cladding system are manufactured and supplied by us.

 

4. Certificates & Quality Management for the prefab workshop kits ( made of steel frame ) :

We have ISO9000, 14000, 18000 by BV France, AWS& EN welder, CE etc to ensure our whole production progress controllable.

We also have systematic Quality Process and Progress Control documentation: Our fabrication process have been controlled by series of documentation and quality testing which are monitored and certificated by BV, SGS, SKM, JACOBES etc world-famous third party inspection organization.

 

5. Our seaworthy packing system for prefab workshop kits ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How to install prefab workshop kits ( made of steel frame ) ?

Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no work teams, we can send our professional teams to install for you.

 

2) Storage Life of prefab workshop kits ( made of steel frame ) ?

Reply: All steel structure frame life is more than 50 Years, all cladding sheets are about 20 Years.

 

3) How can you deal with deformation when welding ?

We select suitable welding method, material and sequence as specified material required.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: