Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Information for prefab shop buildings ( made of steel frame ) :
Standard | ASTM , BS , DIN , GB , JIS |
Material Grade | Q235 & Q345 ( S235JR & S355JR ) |
Dimensions | Yours requirements |
Place Of Origin | Shandong China ( Mainland ) |
FOB Price | US $ 20 - 150 / Square Meter |
Port | Qingdao |
Minimum Order Quantity | 100SQM |
Supply Ability | 1000 Ton / Tons per Month |
Payment Terms | L/C ,T/T |
Quality Control | The third party , SG S , ASIA INSPECTION all accept |
Delivery Term | Within 20 days after signing contract |
Packaging | According yours requirement , usually bundle with steel strip |
Delivery Container | 20'GP , 40'GP , 40'HQ , 40'OT |
Our Experience | Have exported for 13 years , clients from all over the world |
2. We supply both common steel building and the special steel structure:
Besides structural steel building like workshop, warehouse, high rise building, prefab shop buildings ( made of steel frame ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.
3. Project case- Uganda Steel Coil Processing Plant:
Detailed introduction
Project Description: 30x 120M
Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc
Time: Oct. 25, 2012
Location: Uganda
Description:
Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client' s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.
4. How we ensure the high quality of prefab shop buildings ( made of steel frame ) :
After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:
1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.
2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .
3) Professional non-destructive testing, fully equipped.
4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.
5) More than 10 years steel structure fabrication experience
6) Full set of manufacturing process plan to ensure delivery on time.
5. Packing and Shipping for prefab shop buildings ( made of steel frame ) :
Packing Details:
1) For big single steel parts, no need to pack, just protect the end plate with blanket.
2) Main commonly frame: We possess the unique most professional and best packaging solution in China presently - framing package, which perfectly protects the structural steel members from any impact damage during the transport. Or according to customer' s requirement.
3) The cladding part: roof or wall single steel plate whose surface covered by transparent PVC, is wrapped by plastic film.
roof or wall sandwich panel without packing, will load into the container piece by piece, and then fixed firmly.
Shipping:
1) Main big frame will be shipped in bulk carrier
2) Other material load into 20ft( HQ) or / and 40ft( HQ)
3) Cladding part: As our experience, 20ft closed container can be load around 450-500 square meters sandwich panel, but depends on the container is flat enough and the length of the panels. 40ft closed container can load around 900-1000 square meters in the same situations.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of prefab shop buildings ( made of steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the prefab shop buildings ( made of steel frame ) ?
40% advance payment by T/ T, the balance before delivery.