Gold Index: 116359
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service City: Binzhou Province/State: Shandong Country/Region: China (Mainland)
prefab commercial buildings and modular commercial buildings with ASTM
1-930
1. Top serviced client like SIEMENS, GE, Adani, Hyundai2. Reduced construction waste, long lifespan up to 50 years3. We are an ISO 9001: 2000
2017-12-27
Prefab steel warehouse made of steel stucture ISO9001 at South America area
1-746
1. Number of Architectural Designers: 58 2. Free to design architectural drawings for you;3. Structure connected with high intensity bolts
Steel Welded H Section and Pre-engineered Steel Frame to Afghanistan customer
1-242
1. Accessories packed& protected by plastic paper2. Higher degree of industrialization3. We are an ISO 9001: 2000 certified company
2017-12-25
long span building made of modular structure long life installed in Vaduz
1-423
1. Wall& roof panels: be packed by plastic films2. large interior space3. Scope: warehouse, workshop, poultry shed etc
Prefab Steel Structure workshop made of light metal framing multi-functional
1-745
1. 960 workers, including 50 engineers2. Fast installation shorten construction time3. Products passed through strict quality checks
prefab business buildings and modular commercial buildings pre-made
1-929
1. QR code on Raw steel to ensure quality2. Fast installing, time saving and labor saving3. Installation: Our Engineer helps to instruct the i
steel tube structure and Pre-engineered Steel Frame produce for Mali buyer
1-241
1. Bolts and accessories loaded into wooden box2. Most of the used materials are recyclable 3. NDT on welding joints is carried out
tall steel frame buildings made of frame structure CE certified sale to Brunei
1-422
1. Components clearly marked according to drawing2. Excellent anti-shock and anti-impact ability 3. Products passed through strict quality che
Prefab Steel Structure Warehouse made of steel pipe column with new material
1-744
1. 310+ Projects/ 40+ Countries/ 300,000 MT Exported 2. Dimensions: as per customer's requirments3. Branded and reputed consumables are used
prefab apartments and modular commercial buildings with CE Mark at Bissau area
1-928
1. Delivery time: 15 to 40 days, or as client order 2. Lower cost and easy to maintenance and conserve. 3. EPS sandwich panel( for wall, roof,
steel tube columns and Pre-engineered Steel Frame export to Ankara
1-240
1.Shipment: 20' GP, 40' GP, 40' HQ, or in bulk2.Good environmental protection effect3.Installation: Our Engineer instruct the installation
prefabricated building materials made of metal frame with A36 A572 steel
1-421
1. Shipment: 20' GP, 40' GP, 40' HQ, or in bulk2. Higher reliability of steel work3. Connection of steel structure: weld or bolt connection
prefab apartment buildings and modular commercial buildings with modern style
1-927
1. Professional non-destructive testing, fully equipped2. Free to design architectural drawings for you;3. Surface: hot dip galvanize or anti
pre fab metal building and steel building construction outdoor to Mali market
1-420
1. For big single steel parts, no need to pack2. large interior space3. Design: to customer's requirement or we design
prefab shops building made of mild steel frame heavy-duty deftly created
1-743
1. Customers or us specifying freight forwarder2. Low cost, easy and fast to build.3. Lead Time: Within 20days after receiving the deposit.
steel structure welding and Pre-engineered Steel Frame for importer in Senegal
1-239
1. Other material load in 20ft( HQ) / 40ft( HQ)2. Good environmental protection effect3. Span:single span or multi span