Gold Index: 116359
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service City: Binzhou Province/State: Shandong Country/Region: China (Mainland)
steel frame light formed building frame structure large-Span to Guyana market
1-221
1. Accessories packed& protected by plastic paper2. Environmental protection( recyclable steel)3. Foundation connected by anchor bolt
2017-12-25
metal building with apartment made of structual steel ISO9001 export to Korea
1-912
1. Welder working with European CWI certificate2. Building dimensions: as per customer's requirments3. Roof& wall panel: PU, EPS, rock wool sa
2017-12-27
metal workshops and garages made of steelstruct of two story for Cuba client
1-730
1. Annual output reaches 150, 000tons steel frame2. Span life: Up to 50 years.3. Installation: Installation Drawing or Guide on Site
meta office building made of steel pipe column pre-made export to Congo Rep.
1-911
1. Load into 40/20GP, 40HQ, 40OT or Bulk carrier2. Material Standards: AISI, ASTM, BS, DIN, GB, JIS3. Price from USD30/m2 to 70/m2 as per cust
metal workshop buildings made of structural steel pipes of suitable price
1-729
1. Number of Architectural Designers: 58 2. Material Standards: AISI, ASTM, BS, DIN, GB, JIS3. Certification ISO9001: 2008, by BV France
steel frame installation formed steel building shop on sale to Sofia customer
1-220
1. 100% QC inspection before shipment2. Good environmental protection effect3. EPS sandwich panel( for wall, roof, floor)
steel frame fabrication formed steel buiding ISO standard export to Kampala
1-219
1. Shipping depended on order quantity2. Space Efficient due to larger spans& member sizes3. SGS, BV and other testing are available for us
metal workshop made of H section column good price export to Russia
1-728
1. The enterprise has been verified by BV and SGS2. Material Standards: AISI, ASTM, BS, DIN, GB, JIS3. ISO9000, 14000, 18000 by BV France
steel frame erection formed peb steel buildings ISO verified to Niamey market
1-218
1. Sandwich panels covered with plastic film2. Good environmental protection effect3. NDT on welding joints is carried out
metal warehouse buildings made of steal frame fashionable provide to Palestine
1-727
1. Other material load in 20ft( HQ) / 40ft( HQ)2. Span life: Up to 50 years.3. Workshop Column& Beam: Welded or Hot rolled H-section
steel frame components formed span building multi-functional at Rome area
1-217
1. Components clearly marked according to drawing2. Good environmental protection effect3. Installation: we send the Engineer to construction
steel fabrication and erection and construction steel frame at Accra area
1-216
1. 100% QC inspection before shipment2. Widely used in construction site3. Connection of steel structure: weld or bolt connection
medical office building and commercial steel buildings big-Span at Lisbon area
1-910
1. Top serviced client like SIEMENS, GE, Adani, Hyundai2. Fast installation shorten construction time3. SGS, BV and other testing are availabl
metal warehouse building kits made of steal frame with GB code for Asia client
1-726
1. 200, 000 square meter of factory space 2. Fast installing, time saving and labor saving3. Foundation connected by anchor bolt
steel columns and beams and construction steel frame for importer in Ottawa
1-215
1. Shipping depended on order quantity2. Most of the used materials are recyclable 3. Software: Auto CAD, PKPM, MTS, 3D3S
metal warehouse made of steel pipe column OEM customized at Paraguay area
1-725
1. Exported to 80 countries UAE, Saudi Arabia, Iraq etc2. Free to design architectural drawings for you;3. Products passed through strict qual