![]() |
Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
1. Products description for the Steel building ( made of rigid steel frame ) :
Main Steel | |
Steel Beam Column | Q235B , Q345B |
Secondary Steel | |
Tie Bar | Q235B |
Purlin | C and Z purlin |
Bracing | Q235B |
Accessories | |
Surface | Painted or Hot Dip Galvanized |
Door | Rolling Up Door or Sliding Door |
Window | PVC or Aluminum Alloy |
Roof and Wall Panels | Corrugated Steel Sheet , EPS Sandwich Panel , Rock Wool Sandwich Panel , PU Sandwich Panel |
Others | |
Service | Design , Fabrication and Installation |
We can offer quotations according to customers' drawings and requirements , free design drawings and detailed installation drawings . | |
Design software : Auto CAD , PKPM , MTS , 3D3S , TArch , Tekla Structures ( X steel ) V12.0 , etc | |
Packing | main steel frame with 40 OT roof and panel load in 40 HQ Or According To Customer Requirement |
2. Our strength on the Steel building ( made of rigid steel frame ):
1) Rich experience
Rich project experience in different area of different continents.
2) Professional design and R& D team
Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.
3) Advanced production equipment
We possess plenty of advanced production equipment for structure steel and cladding materials.
4) Quality control
Professional procurement team making sure all materials with good quality and are from China top steel mills.
Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.
Our factory operation under highest international standard, ensure the steel fabrication works with high technology.
3. Project case- Argentina Wugan warehouse, 2012:
Description: This project comprises a high specification industrial unit, factory and warehouse for a company producing electronic systems for industry. The building features an integrated two storey office facility, composite panel wall cladding and a curved roof with a standing seam system, barrel vault roof lights and a 10t travelling crane.
The client choose us after visited 6 China suppliers, when they came to our factory, we are producing and delivering steel structure for 9 countries, more than 20 containers are stuffing for 4 countries. No need more words, seeing is believing!
4. We found international surface treatment system for the Steel building ( made of rigid steel frame ) :
We got NACE 1 and 2 level certificate as per American standard.
We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.
5. Our seaworthy packing system for Steel building ( made of rigid steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How about the derust grade of your Steel building ( made of rigid steel frame ) ?
Reply: Ball blasting Sa2.5 on main steel structure or by Galvanized frame;
manual derust St2.5 on secondary steel structure.
2) What kind of panel used for the roof and wall ?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation, sound insulation. Common sandwich materials are EPS, glass wool and PU sandwich panels.
3) Are Steel building ( made of rigid steel frame ) expensive ?
Answer: The steel structure of our company is economic. Its technology and materials used decreases waste expenses such as wood, decorative stone, brick etc. All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased.