![]() |
Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
1. Our excellent design team will design the Steel building ( made of mild steel frame ) for you . If you give the following information :
1 ) Data for design
Wind speed ( KM /H )
Snow load : ( KG / M2 )
Rain load ( KG / M2 )
Earthquake load if have
Demands for doors and windows
Crane ( if have ) , Crane span , crane lift height , max lift capacity , max wheel pressure and min wheel pressure !
2 ) Material quality
Windows and doors quantity , size and location
Roof and wall material , sandwich panel or corrugated steel sheet ( steel sheet can not heat insulation )
3 ) Type
Size -- width , length , eave height and roof slope
Single slope or double slope
Single floor , double floor or multi floor
2. Wide Fields of Steel Structure be used:
1) Industrial steel structure warehouse, Steel building ( made of mild steel frame )
2) Steel workshop / hangar / garage
3) prefabricated steel structure shed, Exhibition Hall, Office buildings
4) Garage, Musty-story building, Agricultural storage
5) Logistic centers and all kinds of steel structure buildings etc
3. Project case- Argentina Wugan warehouse, 2012:
Description: This project comprises a high specification industrial unit, factory and warehouse for a company producing electronic systems for industry. The building features an integrated two storey office facility, composite panel wall cladding and a curved roof with a standing seam system, barrel vault roof lights and a 10t travelling crane.
The client choose us after visited 6 China suppliers, when they came to our factory, we are producing and delivering steel structure for 9 countries, more than 20 containers are stuffing for 4 countries. No need more words, seeing is believing!
4. Trial Assemblies to ensure smooth erection of Steel building ( made of mild steel frame ) on project site:
Our plant is fitted out with large working areas for major assembly work of steel structures and oversized built-up components
In order to ensure the optimal installation of the steel structures on-site, trial assemblies of various and unique steel pieces with complex geometry forming part of a built-up component, are performed in the plant prior to their delivery to site. In addition to validating the quality of the design, the compliance with engineering parameters and fabrication accuracy, these trial assemblies add great value for the client since they mean potential time and cost savings with regard to installation work on site.
To successfully carrying out trial assemblies of large steel components, our fabrication complexes have been fitted out with large production areas and state-of-the-art equipment as well as measurement method, which are integrated in Tekla Structures 3D software, thus ensuring the quality control of its products.
5. Packaging & Shipping for Steel building ( made of mild steel frame ) :
1) Using container:
container of 20 feet, and container of 40 feet
2) By sea for batch goods, for container or bulk-cargo ship, port receiving.
3) Customers specifying freight forwarder or negotiable shipping methods
4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.
6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.
7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of Steel building ( made of mild steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the Steel building ( made of mild steel frame ) ?
40% advance payment by T/ T, the balance before delivery.