![]() |
Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
1. Typical Surface treatment for pre fab steel buildings ( made of steel frame ) :
Surface Treatment |
Hot dip galvanize |
Standard : JIS , DIN , ASTM B695 - 2000 |
Hot dip galvanizing hole cutting good looking on surface |
Galvanizing process : Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing → Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product |
Paint |
1 . Primer paint one coat 20 - 30 um |
2 . Middle paint two coat 40 - 60 um |
3 . Finish paint one coat 20 - 30 um Paint type : 1 . red primer 2 . zinc primer 3 . Alkyd primer |
2. China Steel Structure Solution Leader :
310+ Projects/ 40+ Countries/ 300,000 MT Exported
American& European Certification System
We could fabricate all kinds of steel structure for industrial and civil fields, like Power Plant [ Incl. HRSG( NPP) & Ducts; ACC; Conveyor], Oil Gas & Chemicals, Metal & Mining, Commercial Building, steel workshop, high rise building, Theme Park, Modularization and Fireproofing, etc.
3. Project case- Uganda Steel Coil Processing Plant:
Detailed introduction
Project Description: 30x 120M
Project Type: Gable frame PEB structure with office mezzanine building, Stairs, Platform, etc
Time: Oct. 25, 2012
Location: Uganda
Description:
Site anchor bolt installation all ready finished as planed and all engineering are made as per existing plan to save the client' s investment cost of foundation preparation. We supply the steel structure and panel system within 20 days, which make client very satisfied and we found continuous cooperation with this client after the 1st order.
4. Certification for pre fab steel buildings ( made of steel frame ) :
We are always committed to the development of steel structure. By far we have achieved the following certificates:
CE EN1090 certification
Quality Management System Certification ISO9001: 2008, by BV France
Environment Management System Certification ISO14001: 2004, by BV France
Occupational Health and Safety Management System Certification, by BV France
CWI certificate
TWI certificate
ASME certificate
AWS welder certificate etc.
5. Our seaworthy packing system for pre fab steel buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Is your company a factory or trade company ?
We are factory, so you can get the best & competitive price.
2) What' s the quality assurance you provided and how do you control quality of pre fab steel buildings ( made of steel frame ) ?
Established a procedure to check products at all stages of the manufacturing process: raw materials, welded steel frame, blasted steel frame, finished painted goods, etc.
3) What is your main market for pre fab steel buildings ( made of steel frame ) ?
Guided by global field of vision, our products have been exported to more than 60 countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.
4) How to pack the pre fab steel buildings ( made of steel frame ) ?
A: We use standard seaworthy package. we have exported 400, 000 steel structure and have good experiences. If you have special package requirements, we will pack as required, but the fees will be paid by customers.