Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Metal Building  > metal building structure  > Prefabricated Building made of structal steel of three story at Khartoum area

Prefabricated Building made of structal steel of three story at Khartoum area 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-617
Production Capacity: 8000 Ton/per Month
Delivery Date: 30 days
Standard: Australian standard America...
Certificates:: 1. ISO9000, ISO14000, ISO18...
Service Offered: Design, fabrication, packin...
Means of Transport: Ocean
Packing: Panel accessories will be p...
Brand Name: HX
Material Grade: European S235& S355
Top client Serviced: SIEMENS, American GE, FRANC...

1. Number of Architectural Designers: 58
2. Excellent anti-shock and anti-impact ability
3. Guarantee: The main structure over 35 to 50 years

1. Technical parameters for Prefabricated Building ( made of steel frame ) :

 Size

According to customer's requirements

Standard

GB , DIN , JIS , BS , ASTM

Material

Q235 ; Q345

Surface treatment

Painted with epoxy paint or zinc rich paint

Package

In bundle or pallet or according to the requirements of customers

Delivery

Container or Bulk

Shipment Time

According to the quantity and specification of each order

Production Usage

Used in industrial or civil fields

Product Characteristics

1 . Fine gloss exterior , anti-corrosive

2 . High strength , satisfactory property of the steel

3 . Anti-seismic , wind resistance , environmental protection

4 . Fire- resistant , clean and health

5 . 50-year-long life expectancy

 

Remark

Payment terms : T/T, L/C

Terms of trade

FOB , CFR , CIF , EXW

 

 

2. About us:

Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, Prefabricated Building ( made of steel frame ) etc to all kinds of pre-engineered buildings.

Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.

 

We are also a certified green building partner and all our products comply with international green norms.

 

3. Project case- AIRCRAFT HANGAR IN IRAN( 2013) :

 

The aircraft hangar in IRAN takes up 69M* 32M square meters with partial second floor. The eave height is 7.5meter, span is 32 meter. Drainage slope is 5% .

Main steel structure: welded H steel;

Purlin: cold-rolled C section steel;

Cladding: color steel sheet with foil insulation on roof and glass wool sandwich panels.

 

4. Our company' s design and quotation capability for Prefabricated Building ( made of steel frame ) :

1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.

2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.

3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.

 

5. Our seaworthy packing system for Prefabricated Building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Why should I build steel building using steel structure ?

Steel has the higher strength.

80% recyclable, Steel is the most recycled material in the world.

No warping, no cracking, no chemical treatments.

Stronger connection.

Lower transport costs due to lightweight frames.

Steel frames will not burn, fire proof.

Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.

Each steel structure is a independent engineered.

 

2) How difficult is it to install Prefabricated Building ( made of steel frame ) ?

Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: