Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116359

You are here: home  > Metal Building  > metal building structure  > prefabricated building components made of the structure of steel with ASTM

prefabricated building components made of the structure of steel with ASTM 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-618
Production Capacity: 3000 Ton/per Week
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Welding standard: AWS D1.1
Standard: ASTM standard CE certificat...
Means of Transport: Ocean
Packing: Sandwich panels covered wit...
Brand Name: HX
Surface Treatment: painted with Hempel painte...
Material Grade: European S235& S355 ASTM A3...

1. Top client SIEMENS, GE, Adani, Hyundai
2. Connection of steel structure: weld or bolt
3. Structure connected with high intensity bolts



1. Characteristics for the prefabricated building components ( made of steel frame ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. Our business and products scope:

Our company is dedicated to steel framed buildings, from research, design, manufacture, installation and after-sales service. We mainly provide a comprehensive range of steel structure products, including multi-storey high-rise buildings( for commercial offices, hotels, residents, etc.), light steel structure system( for warehouse, workshop, supermarket etc.) and the wide-span steel structure system( for airport, exhibition center, stadium, etc. ) , prefabricated building components ( made of steel frame ) etc. Additionally, service of technology consult is available.

 

3. Overseas projects we undertook in the last few years:

Industrial Warehouse(13000 m2)― Argentina

Warehouse(14000m2) , Republic of Uzbekistan

Workshop(12000m2) , Canada

Warehouse(3600m2) , Romania

Vegetable Market(2500m2) , Mauritius

Pig shed(3500m2) , USA

Chicken shed(2800m2) , Australia

Aircraft Hangar(1300m2) , Australia

Warehouse(900m2) , Mongolia

Prefabricated house(70m2) , 800 sets , Angola

Container house(20' ) , 60 sets , South Africa

 

4. We can provide shop and installation drawing for prefabricated building components ( made of steel frame ) :

1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.

2) We produce according to the process drawing and make delivery according to the shipping list.

3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.

 

5. Our seaworthy packing system for prefabricated building components ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) How about the delivery time of the prefabricated building components ( made of steel frame ) ?

Reply: Usually, 5000SQM or 800tons steel building within 45-60 days after the order confirmed, also depends on the fabrication quantity.

 

2) What makes you different from other manufacturers ?

We believe our service department has the experience and knowledge to safely service your need for structural steel construction, such as industrial workshop, light steel warehouse, container house, prefabricated building components ( made of steel frame ). We have trained service technicians who will be able to help your erection, and have been providing our customer's an effective service solution.

 

3) Can I customize my prefabricated building components ( made of steel frame ) ?

Answer: We have as a wide variety of finishes and features that will satisfy your personal taste and needs. Please contact our sales to explain some detail you want to customize the warehouse.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: