Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. components and materials of the rigid frame steel buildings ( made of steel frame ) :
Main structure | Welded H section , Lattice structure , Tubular column or beam , space frame etc |
Purlin | C Section Channel or Z Section Channel |
Roof Cladding | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil |
Wall Cladding | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse Brace | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Packing | Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or your drawing |
2. Company Brief:
Founded in Shandong, we are one of the most powerful enterprises of steel building and steel structure in China.
Area of Main factory: 360,000 square meters and the 200,000 square meters' workshops.
Total number of staff: 960 persons, details are as follow:
Number of Admin Staff: 140.
Number of Marketing and Sales: 102.
Number of Architectural Designers: 58
Number of In Line QC: 38.
Number of regular workers for production and installation of rigid frame steel buildings ( made of steel frame ) : 600
We have the experience to do the big projects with the top rank construction company in the world, we are always showing our best service and professionalism, and we have exported the steel structure buildings to more than 110 countries.
3. Market covered:
Euro-market: German, England, French, Russia, Georgia
The American market: USA, Canada, Venezuela
Oceania market: Australia, New Zealand, Samoa
The Africa market: Angola, Algeria, Ghana
4. We can provide shop and installation drawing for rigid frame steel buildings ( made of steel frame ) :
1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.
2) We produce according to the process drawing and make delivery according to the shipping list.
3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.
5. Our seaworthy packing system for rigid frame steel buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Q: How could I control the cost of building a rigid frame steel buildings ( made of steel frame ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a rigid frame steel buildings ( made of steel frame ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a rigid frame steel buildings ( made of steel frame ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.