Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Metal Building  > metal building structure  > rigid frame steel buildings and metal building structure with CE procedure

rigid frame steel buildings and metal building structure with CE procedure 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-625
Production Capacity: 8000 Ton/per Month
Delivery Date: 20 days
Welding standard: AWS D1.1
Quality Control: The third party, SGS, ASIA ...
Specifications:: Main Steel: Q345B, Q235B Co...
Means of Transport: Ocean
Packing: Bolts and accessories loade...
Brand Name: HX
Top client Serviced: SIEMENS, American GE, FRANC...
Service Offered: Design, fabrication, packin...

1. Delivery time: 40 day, or as client order
2. Scope: warehouse, workshop, poultry shed etc
3. EPS sandwich panel( for wall, roof, floor)

1. components and materials of the rigid frame steel buildings ( made of steel frame ) :

Main structure

Welded H section , Lattice structure , Tubular column or beam , space frame etc

Purlin

C Section Channel or Z Section Channel

Roof Cladding

Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil

Wall Cladding

Sandwich Panel or Corrugated Steel Sheet

Tie Rod

Circular Steel Tube

Brace

Round Bar

Column & Transverse Brace

Angle Steel or H Section Steel or Steel Pipe

Knee Brace

Angle Steel

Roof Gutter

Color Steel Sheet

Rainspout

PVC Pipe

Door

Sliding Sandwich Panel Door or Metal Door

Windows

PVC/Plastic Steel/Aluminum Alloy Window

Connecting

High Strength Bolts

Packing

Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ

Drawing

We can make the design and quotation according to your require or your drawing

 

 

2. Company Brief:

Founded in Shandong, we are one of the most powerful enterprises of steel building and steel structure in China.

Area of Main factory: 360,000 square meters and the 200,000 square meters' workshops.

Total number of staff: 960 persons, details are as follow:

Number of Admin Staff: 140.

Number of Marketing and Sales: 102.

Number of Architectural Designers: 58

Number of In Line QC: 38.

Number of regular workers for production and installation of rigid frame steel buildings ( made of steel frame ) : 600

We have the experience to do the big projects with the top rank construction company in the world, we are always showing our best service and professionalism, and we have exported the steel structure buildings to more than 110 countries.

 

3. Market covered:

Euro-market: German, England, French, Russia, Georgia

The American market: USA, Canada, Venezuela

Oceania market: Australia, New Zealand, Samoa

The Africa market: Angola, Algeria, Ghana

 

4. We can provide shop and installation drawing for rigid frame steel buildings ( made of steel frame ) :

1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.

2) We produce according to the process drawing and make delivery according to the shipping list.

3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.

 

5. Our seaworthy packing system for rigid frame steel buildings ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: How could I control the cost of building a rigid frame steel buildings ( made of steel frame ) ?

A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

 

2) Q: How Long does it take to build a rigid frame steel buildings ( made of steel frame ) ?

A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.

 

3) Q: Is it difficult to build a rigid frame steel buildings ( made of steel frame ) ?

A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: