Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. components and materials of the metal buildings direct ( made of steel frame ) :
Main structure | Welded H section , Lattice structure , Tubular column or beam , space frame etc |
Purlin | C Section Channel or Z Section Channel |
Roof Cladding | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil |
Wall Cladding | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse Brace | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Packing | Decided by you , loaded into 1X 40ft GP , 1X20 ft GP , 1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or your drawing |
2. Our products scope include:
Single layered light and MID-sized workshops and warehouses, metal buildings direct ( made of steel frame ), single layered heavy duty workshops, wide-span public buildings, high-layered and super high-layered buildings, muti-layered industrial workshops, office buildings and houses, bridges, wide-span highway bridges and bridges in city, viaducts; industrial platform and support; structures that can be dismantled and transported, etc
3. Project case- Binzhou Tianhong Steel Structure Chemical Plant, 4500 tons:
We work as subcontractor fabricated Steel Structure for Chemical Plant, project including Detail Engineer Plan, Fabrication, Steel Structure including Equipment Platform, Pipe Bridge, Tank Structure, Steel Platform, Handrail, Ladder, we also supply the Grating and Stair Treads.
The steel structure with the advantage of quickly installation, all the steel structure fabricated in workshop and delivery to the project site for installation, connected by high strength bolt, fast and easy installation greatly shorten the construction time which reduce the costs, the whole structure is easy in maintenance, which can be used for more than 50 years.
1) Equipment Framework
Equipment Framework bear the Equipment, Framework Structure mainly welding H Steel.
2) Pipe Bridge
Pipe Bridge mainly support the pipe, truss structure, the Angle Steel and H section steel connected by welding or bolt, the structure divide upper booms,bottom booms, web member etc.
3) Steel Platform
Steel Platform is convenient for several equipment operation, Maintenance and repair.
4. Our engineer team for metal buildings direct ( made of steel frame ) :
We owns 36 TEKLA professional designers, by applying computer work station.
They make the model for steel structure items assembling, define the assembly dimension and inspect the connection status of each joint in three-dimensional way through difference perspectives,
which has optimized the design for realizing 100% successful bolt installation, greatly enhancing working efficiency.
We owns 15 professional STAAD-Pro designers.
As for secondary design and partition treatment of drawings, our design team applies STAAD-Pro together with Ram Connection module to optimize joint design to establish scientific and reasonable assembly design scheme.
5. Our seaworthy packing system for metal buildings direct ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Do you offer guiding installation on site overseas for metal buildings direct ( made of steel frame ) ?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. Besides, We also have our own abroad guiding installation team consisting of more than 400 people.
They have succeeded in many countries, such as Pakistan, Russia, Algeria, Romania, Namibia, Tajikistan, Argentina, Australia, Republic of Uzbekistan.
2) What kind of special service does your company provide for metal buildings direct ( made of steel frame ) ?
We have professional design, production and construction teams, providing customize solution for steel building. The company provides consultation for metal buildings direct ( made of steel frame ) in all aspects, including design, processing and on-site installation and etc.