Gold Index: 116359
Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]
Business Type:Manufacturer, Service City: Binzhou Province/State: Shandong Country/Region: China (Mainland)
icon metal buildings made of built-up H column with ISO provide to Athens
1-530
1. Standard accessary: put into boxes or bag2. First-class equipment with crane( max 200T)3. Span:single span or multi span
2017-12-26
steel building garage and pre engineered metal buildings by ASTM steel
1-687
1. Delivery time: 40 day, or as client order 2. Span:single span or multi span3. Products passed through strict quality checks
heritage steel buildings made of built-up H steel with CE Mark sale to Hungary
1-529
1. Pass approval of ISO, CE, ASME, CWI, SGS, BV2. Main Steel: Q345, Q235, Q345B, Q235B etc.3. Structure connected with high intensity bolts
heavy metal buildings made of heavy structure to ISO code sale to Phnom Penh
1-528
1. Number of Architectural Designers: 58 2. Workshop Column: Welded/ Hot rolled H-section3. We are an ISO 9001: 2000 certified company
green modular buildings made of light gauge metal recyclable sale to Italy
1-527
1. Mainly use: workshop, warehouse, office etc2. Roof& wall panel: PU, EPS, rock wool panel3. We design free dwg as per customers' request
galvanized steel frame building made of structure light outdoor at Egypt area
1-526
1. Exported to 80 nations UAE, Saudi Arabia, etc2. Main Steel: Q345, Q235, Q345B, Q235B etc.3. We are an ISO 9001: 2000 certified company
prefab steel garage and pre engineered metal buildings ATSM standard
1-686
1. Non-destructive test, fully equipped2. Installation: erection dwg or Guide on Site3. Foundation connected by anchor bolt
galvanized steel buildings made of structure construction European standard
1-525
1. Components will be packaged by steel pallet 2. SGS, BV and other test are available for us3. High quality welding process are used
future metal buildings made of built-up steel column muti-floor deftly created
1-524
1. Pass approval of ISO, CE, ASME, CWI, SGS, BV2. First-class equipment with crane( max 200T)3. Guarantee: wall the roof cladding: 15Years.
frame structure building construction made of steel a frame by DIN material
1-523
1. Annual output reach 150, 000ton steel frame2. Software: Tarch, Tekla Structure(Xsteel) V123. Span:single span or multi span
metal shop buildings and pre engineered metal buildings of beautiful design
1-685
1. Non-destructive test, fully equipped2. Workshop Column: Welded/ Hot rolled H-section3. Engineers' guidance on-site is available
frame steel construction made of steel pipe column with CE sale to Mogadishu
1-522
1. Top client SIEMENS, GE, Adani, Hyundai2. Wall& Roof: EPS, Rock wall, PU sandwich etc3. Roof panel colour: white, blue, red, green, etc
frame metal building made of H section column new-designed export to Lesotho
1-521
1. Transport by container or bulk-cargo ship2. Software: Auto CAD, PKPM, MTS, 3D3S3. Wide span: single or multiple span, max span 36m
metal shop building and pre engineered metal buildings easy to install
1-684
1. 200 worker in charge of overseas construction2. Workshop Column: Welded/ Hot rolled H-section3. ISO9000, 14000, 18000 by BV France
first steel frame building made of Steel Framework low-cost at Bangui area
1-520
1. 200, 000 square meter of factory space 2. Surface processing: painted or galvanized3. Our products have been export to 50 countries
metal building garage and pre engineered metal buildings large-Span nice made
1-683
1. Main frame ship in bulk carrier& container2. Roof panel colour: white, blue, green, etc3. NDT on welding joints is carried out