Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. we can give you a quotation for the green modular buildings ( made of steel frame ) if you offer this :
A : Customers have the drawings we can provide you the accurate quotation and full service of production , shipment and installation guide , which is high quality and low cost . Because we own all kinds of technical facilities , complete test instruments and advanced production process . |
B : Without drawings Our excellent design team will freely design the light steel structure warehouse , workshop and other steel buildings for you . If you give the following information , we will give you the most satisfactory price and drawings . 1 . Dimension : Length , width , height etc . 2 . Doors and windows : Dimension , quantity , position . 3 . The material on the roof and the wall . 4 . Local climate : Wind speed , snow load , seismic load , temperature etc . 5 . If you have other requirements , please also inform us . |
2. Our company advantage:
1) Enough capacity
Our factory is occupies an area of 200000 m2, We have 1020 workers. 15, 000tons steel structure per month, So we have enough capacity for your demand on green modular buildings ( made of steel frame ) .
2) Advanced technology
There are 300 sets advanced technology equipment. The CNC cutting machines which are imported from USA to make sure the precise size be cut.
3) customized design
We have 62 senior design engineers, 25 shop dwg detailing engineers. our technology department can make a optimal design just for you review according your requirements and local weather condition.
3. Project case- Congo Steel Sheet Making Factory project, 2016:
Project Overview:
Beam & Column structure with large span curved cellular rafters. Package included structural steel work, stairs, balustrading and steel decking.
Main Contractor: MAPA Group
Engineer: Five Consulting Engineers
Tonnage: 2800
Completion Date: 2016
Due to the tight schedule of this project, to save the time and improve the container delivery efficiency, we use our container stuffing equipment from Germany, which could make us finish one 40 feet container stuffing within 2 minutes. The client and owner are all surprised to see our container stuffing system. What is more important and make them amazing, the goods are 100% brand new and without any damage after reach to project site. This help the owner get many prize from the local government.
4. DESIGN STANDARD& SOFTWARE for green modular buildings ( made of steel frame ) :
Standard: America Standard, Australia Standard, England Standard, China Standard, etc.
Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.
5. Our seaworthy packing system for green modular buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Why should I build steel building using steel structure ?
Steel has the higher strength.
80% recyclable, Steel is the most recycled material in the world.
No warping, no cracking, no chemical treatments.
Stronger connection.
Lower transport costs due to lightweight frames.
Steel frames will not burn, fire proof.
Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.
Each steel structure is a independent engineered.
2) How difficult is it to install green modular buildings ( made of steel frame ) ?
Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.