Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Metal Building  > prefab metal buildings  > first prefabricated building made of sttel frame ISO9001 installed in Laos

first prefabricated building made of sttel frame ISO9001 installed in Laos 

Price: 1000.0 USD 
Payment Terms: L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-519
Production Capacity: 10000 Ton/per Month
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Software used: AutoCAD, PKPM, MTS, 3D3S, T...
Quality Control: The third party, SGS, ASIA ...
Means of Transport: Land
Packing: sea worthy packing
Brand Name: HX
Surface Treatment: Gray paint, red paint, whit...
Installation: Engineer are able to stay a...

1. Top client SIEMENS, GE, Adani, Hyundai
2. Software: Tarch, Tekla Structure(Xsteel) V12
3. Door for workshop: Rolled up door or Sliding door

1. Description of first prefabricated building ( made of steel frame ) :

Steel structure building is a new type of building structure system , which is formed by the main steel framework linking up H-section , Z-section , and U-section steel components , roof and walls using a variety of panels and other components such as windows and doors . Steel structure building is widely used in warehouses , workshops , large factories , and so on .

Dimensions

Length

H-beam : 4000 - 15000mm

Thickness 

web plate : 6 - 32mm      

wing plate : 6 - 40mm

Height

200 - 1200mm

Color

according to customers

Main components

Main frame

H beam

Purlin

C or Z section steel purlin

Brace

Anchor , ordinary , high strength bolt

Bolt

Sandwich panel or steel plate

Roof & wall

PVC or aluminum alloy door

Door

Sliding or rolling door

Insulation panel

EPS , Rock wool , PU sandwich

Material

Q235B , Q345B China standard steel

Sheet

0.5mm or 0.6mm galvanized sheet

 

 

2. Our business and products scope:

Our company is dedicated to steel framed buildings, from research, design, manufacture, installation and after-sales service. We mainly provide a comprehensive range of steel structure products, including multi-storey high-rise buildings( for commercial offices, hotels, residents, etc.), light steel structure system( for warehouse, workshop, supermarket etc.) and the wide-span steel structure system( for airport, exhibition center, stadium, etc. ) , first prefabricated building ( made of steel frame ) etc. Additionally, service of technology consult is available.

 

3. Project case- Congo Steel Sheet Making Factory project, 2016:

Project Overview:

Beam & Column structure with large span curved cellular rafters. Package included structural steel work, stairs, balustrading and steel decking.

Main Contractor: MAPA Group

Engineer: Five Consulting Engineers

Tonnage: 2800

Completion Date: 2016

 

Due to the tight schedule of this project, to save the time and improve the container delivery efficiency, we use our container stuffing  equipment from Germany, which could make us finish one 40 feet container stuffing within 2 minutes. The client and owner are all surprised to see our container stuffing system. What is more important and make them amazing, the goods are 100% brand new and without any damage after reach to project site. This help the owner get many prize from the local government.

 

 

4. DESIGN STANDARD& SOFTWARE for first prefabricated building ( made of steel frame ) :

 

Standard: America Standard, Australia Standard, England Standard, China Standard, etc.

Software: SAP2000, Auto CAD, PKPM, RSTAB, PROE, MTS, Tekla Structures( Xsteel) , 3D3S, Tarch, etc.

 

5. Our seaworthy packing system for first prefabricated building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Price Term: FOB, CFR or CIF.

Shipping seaport: Qingdao Seaport. For FOB, CFR or CIF price, please specify which exact model steel building you need, and tell us your design data so that we can calculate the steel building cost, local transport charges and sea freight.

 

2) Payment: Typically 30% by T/ T as deposit, balance by T/ T before shipment. Other payment way can be negotiated.

 

3) Delivery: for 10000 SQM steel warehouse, goods can be ready for shipment about 1-2 months after receiving deposit.

 

4) How can I get a price for your first prefabricated building ( made of steel frame ) ?

Please send us your drawing; we can according to your drawing give you one price.

Or, give us your design data, we will design and quote to you.

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: