1. Typical Surface treatment for first steel frame building ( made of steel frame ) :
Surface Treatment |
Hot dip galvanize |
Standard : JIS , DIN , ASTM B695 - 2000 |
Hot dip galvanizing hole cutting good looking on surface |
Galvanizing process : Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing → Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product |
Paint |
1 . Primer paint one coat 20 - 30 um |
2 . Middle paint two coat 40 - 60 um |
3 . Finish paint one coat 20 - 30 um Paint type : 1 . red primer 2 . zinc primer 3 . Alkyd primer |
2. We supply both common steel building and the special steel structure:
Besides structural steel building like workshop, warehouse, high rise building, first steel frame building ( made of steel frame ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.
3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:
The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.
4. Our company' s design and quotation capability for first steel frame building ( made of steel frame ) :
1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.
2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.
3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.
5. Our seaworthy packing system for first steel frame building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Common type of the industrial building you supply ?
Portal frame is the usual type in the industrial workshop and warehouse shed, other types like lattice structure, space structure, etc also could be designed and manufacturer as per customers request.
2) What is the quality grade of the first steel frame building ( made of steel frame ) ?
Q345 is used for main steel structure, Q235 is used for secondary steel structure.
Also we could use international steel as per your demand if order qty is big enough.
3) How about the delivery time for your first steel frame building ( made of steel frame ) ?
Usually, within 30-45 days after the order confirmed, also depends on the fabrication quantity.