Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Metal Building  > prefab metal buildings  > first steel frame building made of Steel Framework low-cost at Bangui area

first steel frame building made of Steel Framework low-cost at Bangui area 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-520
Production Capacity: 10000 Ton/per Month
Delivery Date: 30 days
Top client Serviced: SIEMENS, American GE, FRANC...
Shipment by: Shipment: 20'GP, 40'GP, 40'...
Main structure: Welded H section,Lattice st...
Means of Transport: Ocean
Packing: Components will be packaged...
Brand Name: HX
Drawing Design: by client or by us
Specifications: Main Steel: Q345B, Q235B Co...

1. 200, 000 square meter of factory space
2. Surface processing: painted or galvanized
3. Our products have been export to 50 countries

1. Typical Surface treatment for first steel frame building ( made of steel frame ) :

Surface Treatment

Hot dip galvanize 

Standard : JIS , DIN , ASTM B695 - 2000

Hot dip galvanizing hole cutting good looking on surface

Galvanizing process :

Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing →

Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product


Paint

1 . Primer paint one coat 20 - 30 um

2 . Middle paint two coat 40 - 60 um

3 . Finish paint one coat 20 - 30 um

Paint type : 1 . red primer  2 . zinc primer  3 . Alkyd primer

 

 

2. We supply both common steel building and the special steel structure:

Besides structural steel building like workshop, warehouse, high rise building, first steel frame building ( made of steel frame ) etc, we can also do nonstandard structural steel member fabrication according to client' s sample or drawings, like special shape structures, board girder, industrial steel frames, belt conveyor and other supporting frames, steel gallery, reclaimer and deck parts etc.

 

3. Project case- Egypt Structural Steel Pre-engineered Building, 4000 SQM:

The workshop is build in 2009, divided into three parts, include materials manage area, flour produce area and storage area, general total area is 4000 square meters. The workshop adopt portal frame, partly adopt three story frame structure; main steel structure is welded H steel, two coats mid―gray paint on surface for rust prevention, galvanized purlin, roof and wall is single steel sheet, shutter windows on the wall for ventilate.

 

4. Our company' s design and quotation capability for first steel frame building ( made of steel frame ) :

1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.

2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.

3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.

 

5. Our seaworthy packing system for first steel frame building ( made of steel frame ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Common type of the industrial building you supply ?

Portal frame is the usual type in the industrial workshop and warehouse shed, other types like lattice structure, space structure, etc also could be designed and manufacturer as per customers request.

 

2) What is the quality grade of the first steel frame building ( made of steel frame ) ?

Q345 is used for main steel structure, Q235 is used for secondary steel structure.

Also we could use international steel as per your demand if order qty is big enough.

 

3) How about the delivery time for your first steel frame building ( made of steel frame ) ?

Usually, within 30-45 days after the order confirmed, also depends on the fabrication quantity.

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: