Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Structure  > light steel structure  > structural construction formed steel buiding multi-span sale to Cuba

structural construction formed steel buiding multi-span sale to Cuba 

Price: 1000.0 USD 
Payment Terms: T/T 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-79
Production Capacity: 8000 Ton/per Month
Delivery Date: 20 days
Top client Serviced: SIEMENS, American GE, FRANC...
Software used: AutoCAD, PKPM, MTS, 3D3S, T...
Welding standard: AWS D1.1
Means of Transport: Ocean
Packing: Panel accessories will be p...
Brand Name: HX
Drawing Design: by client or by us
Service Offered: Design, fabrication, packin...

1. Main frame ship in bulk carrier& container
2. Fully support in installation & guidance
3. We are an ISO 9001: 2000 certified company



1. Characteristics for the Steel building ( made of structural construction ) :

1 ) Wide span : single span or multiple spans , the max span is 36m without middle column .

2 ) Low cost : Unit price range from USD35 / m2 to USD70 / m2 according to customers' request .

3 ) Fast construction and easy installation .

4 ) Long using life : up to 50 years .

5 ) Easy construction , time-saving , and labor saving 
6 ) Flexible layout , beautiful appearances , and higher space efficiency 
7 ) Be used as warehouses , workshops , shopping mall , dinning hall , stadium , etc .

8 ) Others : environmental protection , stable structure , earthquake proofing , water proofing , and energy conserving .

 

2. Company Data:

We have been focused on providing integrated steel structure and steel building solutions for the construction builders, design institutes, developers and construction material traders. Established in Shandong, our professional products and services have reached more than 100 countries and regions around the world. We mainly provides major steel structure and steel building solutions including Steel Structure Building,steel workshop& warehouse, Multi-story Building. Currently we have founded branch office and factory in many areas, with over 960 employees worldwide. And the production base is located at Shandong, China. We applies industry-leading environmentally friendly green materials, the world' s leading structural design. Our R&D center was established in Beijing and has applied more than 50 patents including 2 innovation patents up to now. Backed up with over 80 talented engineers in steel structural and architectural design.

 

3. Project case- Extended Ship Manufacturing/ Repair Yard& Office Building-Singapore:

Detailed introduction

Location: Singapore, heavy steel structure fabrication work

Tonnage: 2000ton( Including All Main frame and Secondary Structures)

Structure Type: lattice column and truss girder with crane capacity 2x 50T, 1x 32T, 2x 30T, 2x 20T, 2x 15T, 2x 5T.

Execution: October.15, 2012

Difficulty: Material Substitution From British Standard Into Chinese standard and Make the converting and output all the shop-drawings accordingly.

This project, the fabrication standard is as per American standard, all the welders shall have the AWS welder certificate, the 3rd party QC will stay in our factory track the whole fabrication process. Finally after 50 days efforts, our products pass the inspection by client 100% at once. Client feel happy to work with us. Now we are the VIP supplier in client' s list.

 

4. Payment Terms & Delivery for Steel building ( made of structural construction ) :

Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)

Delivery time: 15 to 40 days, usually as customers' order

Shipment: 20' GP, 40' GP, 40' HQ, or in bulk

 

5. Packaging & Shipping for Steel building ( made of structural construction ) :

1) Using container:

container of 20 feet, and container of 40 feet

2) By sea for batch goods, for container or bulk-cargo ship, port receiving.

3) Customers specifying freight forwarder or negotiable shipping methods

4) All of the steel column& beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.

5) To make the loading and unloading more efficiently and saving the delivery cost, 40' OT is preferred to loading the steel frames.

6) All the wall and roof panels will be filmed by two sides and fixed stably in the 40HQ container.

7) All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container.

 

6. FAQ:

1) How can I install these Steel building ( made of structural construction ) together as a building after cargo arrived ?

Normally, most clients choose to install the steel building structure frame themselves or ask local technical engineer for further instruction.

If local technical support is not available or cost too much, we could also provide technical support engineer cross over-seas for installation guide even with our installation engineering team.

 

2) How to maintain my Steel building ( made of structural construction ) years of using ?

Steel building ( made of structural construction ) are built for long-time, reliable, steady usage purpose, the maintenance process is easy to operate and complete, most our product can live 10-15 years with minimal maintenance work like gel filled and paint spray. We will keep tracking the usage performance of our products and provide maintenance instruction for our clients.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: