Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Steel building ( made of structural fabrication ) main components description :
1 ) Mainly made by H - section and box girder .
Wide flanges make H - beam have a higher lateral stiffness fit for compression member .
Flanges of H - section with same thickness parallel with one another have strong resistance to bending , easy to composite and joint with other component for your prefab steel structure workshop .
2 ) Support System
Support system of prefab steel structure workshop mainly consist of purlin , cross bracing and angle brace made by Z - section , C - section or angle , allot the payload of column and pillar , transfer the loading to whole frame .
Support system makes the frame structure stand as a unity ; improve the solidity and stabilization of frame itself .
3 ) Roof and wall panel system
Roof and wall panel system mainly made of color steel or color steel sandwich panel .
Roof and wall panel system connected by self-tapping screw , easy and fast to assemble .
Good mechanical property as well as bearing capacity of prefab steel structure workshop .
Multiple color and surface finishing available meet your customization requirement and preference for prefab steel structure workshop .
2. Our Company Brief:
We are a professional manufacture who' s devoted to steel structure building construction. We provide the whole set of services include making construction design, producing products and installation.
We are located in Shandong Province. Our factory workshop covering an area of 200,000 square meters. We have 960 workers,including 50 high quality engineering technical personnel. We could produce up to 15,000 tons of steel structure each month. Including H section, lattice steel structure, tubular structure, space frame etc.
We are always stick to the tenent that "quality first,customer first" . When you choose us, you will have peace of mind for many years to come. We are here in Shandong province, China. We are looking forward to your coming!
3. Project case- Industry Prefabricated Steel building:
Argentina prefabricated steel workshop project was done in the year of 2013, finished installation in the year of 2014. Total area of this workshop is 5, 700 square meters. Main workshop size is 84X 60X 9m, totally 4 spans, 15m per span with one 3ton crane in each, lifting height of the crane is 6m. Two accessory houses on both sides of the main workshop.
4. Our engineer team for Steel building ( made of structural fabrication ) :
We owns 36 TEKLA professional designers, by applying computer work station.
They make the model for steel structure items assembling, define the assembly dimension and inspect the connection status of each joint in three-dimensional way through difference perspectives,
which has optimized the design for realizing 100% successful bolt installation, greatly enhancing working efficiency.
We owns 15 professional STAAD-Pro designers.
As for secondary design and partition treatment of drawings, our design team applies STAAD-Pro together with Ram Connection module to optimize joint design to establish scientific and reasonable assembly design scheme.
5. Packing & Delivery for Steel building ( made of structural fabrication ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) How to buy your ideal Steel building ( made of structural fabrication ) ?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.
2) What is the delivery time of Steel building ( made of structural fabrication ) ?
A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.
3) How to install after the goods arriving destination ?
A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4) Q: Does your steel building can only be used in residential building ?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.