![]() |
Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
1. Data of the Steel building ( made of structural steelwork ) :
Specification | |
Material : | Grade Q235 , equivalent to ASTM A36 Grade Q345 , equivalent to ASTM A572 |
Section : | Any product shape according to customer's requirements |
Certification : | ISO quality system , Chinese GB50221 - 2001 |
Sand Blast : | SA 2.5 Sand blasting |
Welding Technology : | Single level butt welding , fillet welding by electric arc welding , and Gas shielded welding |
Surface treatment : | Hot dip galvanized , Epoxy zinc rich primer Standard : ISO1461 ( 1999 ) , JIS H 8641 - 1999 , ASTM A 123 / A 123M-02 |
Welding Testing | Ultrasonic Testing , X-ray Testing |
Manufacturing Technology | Drilling , Cutting , Assembling , Welding , Rectification , Testing etc |
2. Our strength on the Steel building ( made of structural steelwork ):
1) Rich experience
Rich project experience in different area of different continents.
2) Professional design and R& D team
Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.
3) Advanced production equipment
We possess plenty of advanced production equipment for structure steel and cladding materials.
4) Quality control
Professional procurement team making sure all materials with good quality and are from China top steel mills.
Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.
Our factory operation under highest international standard, ensure the steel fabrication works with high technology.
3. Project case- Description of Hengda steel structure workshop building:
The axis area for this steel structure workshop building is 19578m2
Axis dimension is 180m, 108m, the eave height is 14.15meters.
The primary member is Q345B, all are sand-blasting,
The surface treatment quality required meets GB 8923 SA 2 1/2 Grade
Painting is two coats of anti-corrosive primer and two alkyd finish
Crane runway girder is equipped in each span, install 32mt and 16mt overhead crane
4. Our company' s design and quotation capability for Steel building ( made of structural steelwork ) :
1) We make visual architectural drawings and 3D effect drawings according to customers' demand, enabling customers to see the products they desire clearly. Therefore, the best plan dwgs can be sent to customers efficiently.
2) After deciding the scheme, we will begin to design the building structure. We will carry out stress analysis and structural calculation through " 3D3S " and " PKPM ". Then we conduct secondary optimization of the scheme based on calculation report, and ensure the safety performance of building structure with the most reasonable steel quantity and connection method.
3) After designing the structure, our quotation specialist will make the engineering material bill according to structural design drawings, and provide the final engineering quotation list after referring and adjusting to the material price information on the market.
5. Packing & Delivery for Steel building ( made of structural steelwork ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) How to buy your ideal Steel building ( made of structural steelwork ) ?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, balance before loading by TT.
2) What is the delivery time of Steel building ( made of structural steelwork ) ?
A: It all depends on the order quantities. Usually, delivery time will be within 1 to 2 months.
3) How to install after the goods arriving destination ?
A: We will provide detailed erection dwgs to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
4) Q: Does your steel building can only be used in residential building ?
A: Absolutely not. It can be used in all kinds of buildings, such as hotel, commercial office, school, entertainment club, light industrial workshop, etc.