Post Offer Free
Shandong Huaxing Steel Structure Co., LTD.
Shandong Huaxing Steel Structure Co., LTD.  

Gold Index: 116354

You are here: home  > Steel Frame  > lightweight steel frame  > metal fabrication parts and lightweight steel frame supply for Chad customer

metal fabrication parts and lightweight steel frame supply for Chad customer 

Price: 1000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: 1-179
Production Capacity: 3000 Ton/per Week
Delivery Date: 15 to 40 days
Top client Serviced: SIEMENS, American GE, FRANC...
Material Grade: Grade Q235, equivalent to A...
Surface Treatment: galvainzed galvainzed, then...
Means of Transport: Ocean
Packing: Components will be packaged...
Brand Name: HX
Certificates:: EN-1090 CE certificate, Ame...
Standard: American code European code...

1. Load into 40/20GP, 40HQ, 40OT/ Bulk carrier
2. ISO9000, 14000, 18000 by BV France
3. Surface processing: painted or galvanized



1. Technical parameters for Steel building ( made of metal fabrication parts ) :

 Size

According to customer's requirements

Standard

GB , DIN , JIS , BS , ASTM

Material

Q235 ; Q345

Surface treatment

Painted with epoxy paint or zinc rich paint

Package

In bundle or pallet or according to the requirements of customers

Delivery

Container or Bulk

Shipment Time

According to the quantity and specification of each order

Production Usage

Used in industrial or civil fields

Product Characteristics

1 . Fine gloss exterior , anti-corrosive

2 . High strength , satisfactory property of the steel

3 . Anti-seismic , wind resistance , environmental protection

4 . Fire- resistant , clean and health

5 . 50-year-long life expectancy

 

Remark

Payment terms : T/T, L/C

Terms of trade

FOB , CFR , CIF , EXW

 

 

2. Our strength on the Steel building ( made of metal fabrication parts ):

1) Rich experience

Rich project experience in different area of different continents.

2) Professional design and R& D team

Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.

3) Advanced production equipment

We possess plenty of advanced production equipment for structure steel and cladding materials.

4) Quality control

Professional procurement team making sure all materials with good quality and are from China top steel mills.

Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.

Our factory operation under highest international standard, ensure the steel fabrication works with high technology.

 

3. Project case- Heavy Steel Structure Building in Qingdao, 60, 000 SQM:

The Project - metallurgical automatic transmission equipment assembly base steel structure project. Located in Qingdao China High-tech Zone, total span is 120 meters, total length is 198.1 meters; eave height is 13.2 meters; the ridge height is 18.6 meters.

1) Trims,flashing: color steel sheet;

2) Gutter: color steel sheet;

3) Downpipe: PVC;

4) Door: sandwich panel door;

5) Window: Aluminium window( single glass)

This project is the national important investment project, the government, 3rd party QC consultant and the owner track the quality and progress very strictly in the whole process, finally they are satisfied with our quality and performance, and issue 5% extra bonus for our one month advance delivery which save them too much cost and make their production beginning earlier.

 

4. We found international surface treatment system for the Steel building ( made of metal fabrication parts ) :

We got NACE 1 and 2 level certificate as per American standard.

We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.

 

5. Our seaworthy packing system for Steel building ( made of metal fabrication parts ) :

 

We found mature exporting packing and stuffing system:

With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.

 

To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.

 

6. FAQ:

1) Q: Are you a factory or trading company ?

A: We are a factory located in Binzhou City, Shandong province.

 

2) Q: What' s your supply capacity ?

A: we have various steel structure product, like Steel building ( made of metal fabrication parts ) etc, annual Production output for refer: prefab building 1, 000, 000square meters; steel structure 150, 000 tons.

 

3) Q: Is Steel building ( made of metal fabrication parts ) stable ?

A: Set your hearts at rest! You are completely safe living in light steel prefab building even if there are hurricanes of 200km/ h and 9-grade earthquake outside.

 

4) Q: Does Steel building ( made of metal fabrication parts ) look different from the ordinary one ?

A: Yes. It is more beautiful and suitable for any style.

 

 


bigPhoto
 Mr. zhang
Vice General Manager
Tel: 86-543-2127969
Fax: 86-543-2127069
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Huaxing Steel Structure Co., LTD. [China (Mainland)]


Business Type:Manufacturer, Service
City: Binzhou
Province/State: Shandong
Country/Region: China (Mainland)

You May Like: