Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Information for Steel building ( made of heavy steel structural fabrication ) :
Standard | ASTM , BS , DIN , GB , JIS |
Material Grade | Q235 & Q345 ( S235JR & S355JR ) |
Dimensions | Yours requirements |
Place Of Origin | Shandong China ( Mainland ) |
FOB Price | US $ 20 - 150 / Square Meter |
Port | Qingdao |
Minimum Order Quantity | 100SQM |
Supply Ability | 1000 Ton / Tons per Month |
Payment Terms | L/C ,T/T |
Quality Control | The third party , SG S , ASIA INSPECTION all accept |
Delivery Term | Within 20 days after signing contract |
Packaging | According yours requirement , usually bundle with steel strip |
Delivery Container | 20'GP , 40'GP , 40'HQ , 40'OT |
Our Experience | Have exported for 13 years , clients from all over the world |
2. Who we are:
We are an integrated and professional steel building & steel structure provider in Shandong China. Specialized in the fields of steel structure building manufacturing and international business, Based the principle of sincerity, credit, mutual benefit and rich resources from China we have provided best quality products and value-adding service to customers for more than 15 years. As return, we won top reputation and established long-term business relation with customers from more than 50 countries and regions. Our customers are very satisfied with our good reputation, efficient working system, good service for resourcing, inspection, loading, installation guidance and claim solving.
Our top serviced client include SIEMENS, GE, India Adani Power, Hyundai Steel etc.
3. Project case- Congo Hebe Fabrication Petro-chemical Plant Module:
Product Description
Type 1 steel warehouse( 2500 m2) details:
A. Length: 130m
B. 10 meters between the 7 main frames
C. Height: 10 meters inside
D. Slope for roof: 23%
E. Aluminium panels for Roof with 35um coating thickness
F. 10T Overhead bridge Crane( also known as dual-beam bridge / gantry crane bridge
G. The Congo client need the side walls( only 3 sides) , for the 4th side, quoting a self collapsing gate
4. We can provide shop and installation drawing for Steel building ( made of heavy steel structural fabrication ) :
1) After reaching a contract, we will carry out a detailed design in terms of the structural drawing and architectural drawing, build a three-dimensional model system by Tekla Structures( Xsteel) , and work out the shop drawing of each component efficiently and accurately. This not only can benefit future precise manufacturing but also can avoid component collision during construction in later stage.
2) We produce according to the process drawing and make delivery according to the shipping list.
3) We provide a complete set of installation drawings. If the customer has requirements, we can provide installation guiding services.
5. Packing & Delivery for Steel building ( made of heavy steel structural fabrication ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Q: How could I control the cost of building a Steel building ( made of heavy steel structural fabrication ) ?
A: Firstly, the designing scheme should be mutually discussed and then accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
2) Q: How Long does it take to build a Steel building ( made of heavy steel structural fabrication ) ?
A: It depends on the size of the warehouse. Generally, the construction period of is 1 month of a 2000-square-meter workshop by a construction team of 8-10 people. It only costs 2-3 weeks to build the steel structure frame.
3) Q: Is it difficult to build a Steel building ( made of heavy steel structural fabrication ) ?
A: totally not, you can let your local teams build it according to the construction drawings and erection guiding video provided by us.