Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Specifications of the Steel building ( made of light frame steel ) :
Main steel frame : | H section steel beam and columns |
Secondary frame : | Galvanized C / Z purlin , steel bracing , tied bar , knee brace , edge cover etc . |
Roof & Wall panel : | Sandwich panel , corrugated steel sheet or skylight panel |
Tie Rod : | Circular Steel Tube |
Brace : | Round Bar |
Knee Brace : | Angle Steel |
Roof Gutter : | Color Steel Sheet or galvanized Steel sheet |
Rainspout : | PVC Pipe |
Door : | Swing door , sliding door or roller door |
Windows : | PVC steel or Aluminum Alloy Window |
Connecting : | Anchor bolt , high-strength bolt , common bolt |
Drawing : | We can make the design and quotation according to your requirement or your drawing |
Installation : | Provide full set of construction drawings and video to direct installation ; Engineer are able to stay at site to direct construction |
2. We are specialized in design and production of prefab steel building, heavy Structure, workshop& warehouse etc. :
We have a strong technical team. We have 960 employees, 80 of them are professional designers and engineers with rich experience in designing and producing. Base in our good management, good quality and excellent after selling service, we got ISO9000, 14000, 18000 by BV France, AWS welder, EN welder, CE certificate, SGS. It brought much business chance to us.
Depending on our professional engineers, most of our products got the design patent. Therefore, our products are not only welcomed by our homeland customers, but also popular among many foreign countries, such as Australia, Qatar, Iran, Sudan, Angola and East-south Asia, Middle East and other regions, etc.
3. Some of OUR WORKSHOP/ WAREHOUSE PROJECTS:
1) AREVA Transformer Factory Project:
Covering an area totaled 33, 842 sq.m, the program consumed steel in 4299 tons, the column height is 31-33 m, and the inside is installed with the bunk bed traveling crane with the maximum hoisting capacity in 400 tons.
2) NEW ZEALAND Barns / Grain Warehouses:
light gauge steel structure with cold bended profiles.
3) BOLIVIA Cement Plant:
Steel consumption: 3, 655 tons in the first phase, 7200 tons in the second phase.
4) LDK Polysilicon Public Project:
Was generally contracted by FLR CO., LTD, the total steel consumption volume for Phase I project reached over 3000 tons and this program was in a high-rise steel structure of 4-7 floors.
4. What you can get from us for your demanded Steel building ( made of light frame steel ) :
1) Steel structure special designing and processing
2) EPS sandwich panel( for wall, roof, floor)
3) All construction & decoration materials &downpipe are strictly selected.
4) Designing & Installation drawings( in details)
5) Full support in installation technology & guidance
6) Engineers' guidance on-site in your place is available
7) Custom-made service is available
5. Packing & Delivery for Steel building ( made of light frame steel ) :
For Main Components: Put steel structure components on a steel pallet and tie up the frame part together by packing strap with wood beam and cardboard, then load into container by crane or forklift
For cladding: Plastic film wrap the roof and wall corrugated single steel plate.
but for sandwich panel will load into container piece by piece
This package is to protect the goods from damage, during the transportation.
Delivery:
Load into 40/ 20GP, 40HQ, 40OT or Bulk carrier.
Delivery Time: 15 to 30 days after the receiving deposit or according to client' s requirements.
6. FAQ:
1) Can I have a visit to your factory before the order ?
A: Why not ? welcome to visit our factory. You can fly to Jinan Airport. We will pick you up in the airport. Hotel booking service is available.
2) Do you supply installation service for Steel building ( made of light frame steel ) ?
A: Yes, we do. But you will pay for our professional fee if we install in your local place. Then we will send engineers to supervise it.
3) How long can the Steel building ( made of light frame steel ) be used ?
A: The use life of the main structure is the designed used life, that is 50-100 years( standard request of GB) .