Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Product Details for commercial steel frame buildings ( made of steel frame ) :
Main frame | ||
1 | Main steel structure
( columns and beams ) | 1 . Steel Q345 ( S355JR ) or Q235 ( S235JR ) H shape 2 . Straight cross-section or Variable cross - section |
2 | Sub steel structure | 1 . Material Q235 ( S235JR ) steel 2 . Bolt connections . Anti-rust painted or galvanized . 3 . Bracing :X - type or V - type or other type bracing made from angle , round pipe , etc 4 . Purlins : C or Z type : Size from C120 ~ C320 , Z100 ~ Z200 |
Maintenance system | ||
3 | Roof | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
4 | Wall | Sandwich panel ( PU / EPS / fiberglass / rook wool ) or Colorful steel tile |
Doors | Steel rolling shutter or others | |
Windows | Alu. Alloy window , or others | |
Fitting | ||
7 | Edge Cover | Steel sheet 0.5mm thickness |
8 | Bolts | M24 , M22 , M16 embedded bolts , intensive bolts , galvanized ordinary bolts , high-strength bolts , etc |
9 | Others options | Day - lighting panel , Roof ventilator , Down pipe , Galvanized , Crane , sanitary Products , etc |
10 | Foundation | Cement and steel foundation bolts |
2. About us:
Our company commenced its operations in 2004, and pioneered the high-end metal building products market in China. We have been the first mover in China, right from workshop, high rise building, commercial steel frame buildings ( made of steel frame ) etc to all kinds of pre-engineered buildings.
Today, we are a leading turnkey Pre-Engineered Steel building Construction Solution provider in China with integrated facilities for design, manufacture, logistics, supply and project execution capabilities for pre-engineered steel buildings. We holds a significant part of market share in Asia for metal building systems. We works in close association with industry leaders in project development and construction, providing support to critical industrial, commercial and infrastructure projects.
We are also a certified green building partner and all our products comply with international green norms.
3. Project case- Heavy Steel Structure Building in Qingdao, 60, 000 SQM:
The Project - metallurgical automatic transmission equipment assembly base steel structure project. Located in Qingdao China High-tech Zone, total span is 120 meters, total length is 198.1 meters; eave height is 13.2 meters; the ridge height is 18.6 meters.
1) Trims,flashing: color steel sheet;
2) Gutter: color steel sheet;
3) Downpipe: PVC;
4) Door: sandwich panel door;
5) Window: Aluminium window( single glass)
This project is the national important investment project, the government, 3rd party QC consultant and the owner track the quality and progress very strictly in the whole process, finally they are satisfied with our quality and performance, and issue 5% extra bonus for our one month advance delivery which save them too much cost and make their production beginning earlier.
4. Payment Terms & Delivery for commercial steel frame buildings ( made of steel frame ) :
Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)
Delivery time: 15 to 40 days, usually as customers' order
Shipment: 20' GP, 40' GP, 40' HQ, or in bulk
5. Our seaworthy packing system for commercial steel frame buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Price Term: FOB, CFR or CIF.
Shipping seaport: Qingdao Seaport. For FOB, CFR or CIF price, please specify which exact model steel building you need, and tell us your design data so that we can calculate the steel building cost, local transport charges and sea freight.
2) Payment: Typically 30% by T/ T as deposit, balance by T/ T before shipment. Other payment way can be negotiated.
3) Delivery: for 10000 SQM steel warehouse, goods can be ready for shipment about 1-2 months after receiving deposit.
4) How can I get a price for your commercial steel frame buildings ( made of steel frame ) ?
Please send us your drawing; we can according to your drawing give you one price.
Or, give us your design data, we will design and quote to you.