Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Specifications of the Commercial Building ( made of steel frame ) :
Main steel frame : | H section steel beam and columns |
Secondary frame : | Galvanized C / Z purlin , steel bracing , tied bar , knee brace , edge cover etc . |
Roof & Wall panel : | Sandwich panel , corrugated steel sheet or skylight panel |
Tie Rod : | Circular Steel Tube |
Brace : | Round Bar |
Knee Brace : | Angle Steel |
Roof Gutter : | Color Steel Sheet or galvanized Steel sheet |
Rainspout : | PVC Pipe |
Door : | Swing door , sliding door or roller door |
Windows : | PVC steel or Aluminum Alloy Window |
Connecting : | Anchor bolt , high-strength bolt , common bolt |
Drawing : | We can make the design and quotation according to your requirement or your drawing |
Installation : | Provide full set of construction drawings and video to direct installation ; Engineer are able to stay at site to direct construction |
2. Why Our Commercial Building ( made of steel frame ) is your Right Choice:
1) Stable and deep financial capacity
Any investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.
2) Competitive Prices
Our production capacity(approximately 200,000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
3) Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced design software we use.
4) Fast Delivery
We are able to design, detail, fabricate and supply simple steel buildings in approximately 4 weeks. Most of our buildings are delivered and erected within 8 weeks(this relies on various factors such as site position, weather etc).
5) Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily. Any problems that arise are quickly dealt with to minimize any delays. Safety on site is also made a priority.
3. Project name: Pakistan Ceramic Tile Factory, 2015, 49050 m2:
Location: Pakistan
Area: 49050m2
Project time: the year of 2015
This workshop is used for ceramic tile production, all use steel frame with an area of 49050 m2. Main materials are as following:
Steel truss: Q345B
Column: Q345B
Roof & wall purlin: galvanized Z280X75X20X2.5
Horizontal bracing: 25 round steel
Wall cladding: corrugated steel sheet+glass wool+corrugated steel sheet
Roof cladding: corrugated steel sheet+glass wool, skylight panel, ventilator
Door: electric rolling door, electric sliding door
4. How we ensure the high quality of Commercial Building ( made of steel frame ) :
After years of exploration, practice and improvement, our company has built an experienced technical team in steel structure. Every project is supposed to go through the following procedures:
1) Owing plasma cutting, flame cutting, available to provide multiple cutting service.
2) Well-experienced engineer team and production team for steel structure fabrication, welder working with CWI certificate, according to WPS( welding procedure specification) and PQR( procedure qualification record) .
3) Professional non-destructive testing, fully equipped.
4) Professional surface treatment: sandblasting, paint spraying, powder coating as per American standard.
5) More than 10 years steel structure fabrication experience
6) Full set of manufacturing process plan to ensure delivery on time.
5. Our seaworthy packing system for Commercial Building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) What kind of company you are ?
We are steel structure building Manufacturer located in Shandong China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.
2) Does your company is a factory or trade company ?
We are factory, so you will enjoy the best price and competitive price. The price of Commercial Building ( made of steel frame ) is composed of the quotation for steel structure, wall and roof panel. It has absolute price advantage for its low manpower cost, short building period and low requirement on building site even the material cost is high in comparison to the building with the traditional material.