Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Why give the production job of commercial complex building ( made of steel frame ) to us :
1) CNC punching machine , CNC bending machine , CNC welding machine , plasma cutting , high-power laser cutting and water jet cutting . available to provide multiple cutting service .
2) Well-experienced engineer team and production team for steel structure fabrication , welder working with CWI certificate , according to WPS ( welding procedure specification ) and PQR ( procedure qualification record ) .
3) Professional non-destructive testing , fully equipped .
4) Four painting line can supply high and quickly painting service . Professional surface treatment : hot-dip galvanizing , sandblasting , paint spraying , powder coating , plating .
5) More than 8 years in steel structure experience .
6) Full set of manufacturing process plan to ensure delivery on time .
2. Applications of steel structure:
Structural steel fabrication have become increasingly and widely used at the workshops, warehouse, commercial complex building ( made of steel frame ) and other industrial and civil architectures. For example, single-span and multi-span gantry light-frame structures, exhibition Hall, industrial steel frame, Office buildings, Garage, Multy-story building, Hanger, Agricultural storage, Logistic centers, and all kinds of steel construction, etc.
3. Project case- Singapore Ship Manufacturing Yard, 1100ton:
Detailed introduction
Location: Singapore
Tonnage: 1100ton
Structure Type: 40m x150m, lattice column and truss girder with 30MT crane capacity.
Function: Ship Manufacturing/ Repair Yard
Execution: Feb 2011~ April, 2013
This client pay much attention on the product surface quality, after they check our welding like quality and the smooth surface after painting, they made the decision to work with us without any hesitation.
Our good surface quality is due to we found international surface treatment regulation for many years.
We got NACE 1 and 2 level certificate as per American standard. We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000M2 fully-enclosed painting workshop and 20,000 SQM enclosed packing workshop.
4. Payment Terms & Delivery for commercial complex building ( made of steel frame ) :
Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)
Delivery time: 15 to 40 days, usually as customers' order
Shipment: 20' GP, 40' GP, 40' HQ, or in bulk
5. Our seaworthy packing system for commercial complex building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of commercial complex building ( made of steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the commercial complex building ( made of steel frame ) ?
40% advance payment by T/ T, the balance before delivery.