Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. commercial steel framing building ( made of steel frame ) products description :
Dimensions | Length | H beam : 4000 - 15000mm |
Thickness | web plate : 6 - 32mm wing plate : 6 - 40mm | |
Height | 200 - 1200mm | |
Color | Depend on customers' needs | |
Advantages | 1 . Design according to customers' requirements | |
2 . Manufacture under complete quality control system --- ISO9001 | ||
3 . Installation with instruction of experienced engineers | ||
4 . Easy to assemble and dismantle | ||
5 . Eco-friendly material: can be used for several times and recyclable | ||
6 . Short construction period , long using time | ||
7 . High strength and stiffness , high weight bearing. | ||
8 . Sound insulation and heat insulation ; antisepsis and damp proofing ; waterproof and aseismatic | ||
Main components | Main frame | H beam |
Purlin | C or Z section steel purlin | |
Brace | Anchor , ordinary , high strength bolt | |
Bolt | Sandwich panel or steel plate | |
Roof &wall | PVC or aluminum alloy door | |
Door | Sliding or rolling door | |
Insulation panel | EPS , Rock wool , PU sandwich | |
Material | Q235B Q345B China standard steel | |
Sheet | 0.5mm or 0.6mm galvanized sheet |
2. Our strength on the commercial steel framing building ( made of steel frame ):
1) Rich experience
Rich project experience in different area of different continents.
2) Professional design and R& D team
Full solution for steel building design. We could make the design as per your requirement, or give your professional suggestion.
3) Advanced production equipment
We possess plenty of advanced production equipment for structure steel and cladding materials.
4) Quality control
Professional procurement team making sure all materials with good quality and are from China top steel mills.
Our workers have more than 10 years experiences and certification for professional welding. Half or them got the AWS and EN welder certificate.
Our factory operation under highest international standard, ensure the steel fabrication works with high technology.
3. Project case- Philippines Prefabricated Cold Storage Warehouse, 2013, 2900 tons:
Main steel frame:
Steel beam & column: Q345, Welded H beam
Wind-resistant column: Q345, Welded H beam
Secondary frame:
Roof purlin: Z250*75*20*2.2
Ceiling purlin: C120*50*20*2.2
Wall purlin: C180*70*20*2
Tie bar: 102*2
Vertical & horizontal bracing: 20
Kneel-bracing: L504
Purlin bracing: Q235, 12
Sleeves tube: Q235, 32*2.5
Roof system:
Type V930 pu panel 0.5/100/0.6mm Pu panel
Wall system:
Type v930 panel 0.5/100/0.6mm Pu panel
This project is invested by the government, before the client issue the order, the client, government, and the 3rd party consulting company visited us for 4 times. Finally after compare the advantage between 6 suppliers, they choose us. The later result prove their selection are wise. We finish the project 20 days before the delivery end date, and with good quality.
4. Payment Terms & Delivery for commercial steel framing building ( made of steel frame ) :
Payment: L/ C or by T/ T( 30% prepaid as deposit, balance 70% before shipment)
Delivery time: 15 to 40 days, usually as customers' order
Shipment: 20' GP, 40' GP, 40' HQ, or in bulk
5. Our seaworthy packing system for commercial steel framing building ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) Why should I build steel building using steel structure ?
Steel has the higher strength.
80% recyclable, Steel is the most recycled material in the world.
No warping, no cracking, no chemical treatments.
Stronger connection.
Lower transport costs due to lightweight frames.
Steel frames will not burn, fire proof.
Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.
Each steel structure is a independent engineered.
2) How difficult is it to install commercial steel framing building ( made of steel frame ) ?
Too easy! Some customers who purchase prefabricated steel building choose to install their own warehouse using local erection team.