Shandong Huaxing Steel Structure Co., LTD.
|
Price: | 1000.0 USD |
Payment Terms: | L/C |
Place of Origin: | Shandong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Typical Surface treatment for steel construction buildings ( made of steel frame ) :
Surface Treatment |
Hot dip galvanize |
Standard : JIS , DIN , ASTM B695 - 2000 |
Hot dip galvanizing hole cutting good looking on surface |
Galvanizing process : Steel structural components → Degreasing → Rinsing→ Pickling → Rinsing → Fluxing → Galvanizing → Quenching → (Passivation) → Inspecting → Finished Product |
Paint |
1 . Primer paint one coat 20 - 30 um |
2 . Middle paint two coat 40 - 60 um |
3 . Finish paint one coat 20 - 30 um Paint type : 1 . red primer 2 . zinc primer 3 . Alkyd primer |
2. About us:
Our company is established in Shandong China, with 10 advanced production lines. We have over 1000 employee and around 80 experienced engineers, so we can offer you design, production, installation service at any time. So, we have enough ability and experience to do your project well. And we can also provide more solutions for customers.
Our product: steel construction buildings ( made of steel frame ) , industrial steel structure, civil steel structure, steel high rise buildings, steel warehouse&workshop, steel hanger, etc
3. Project case- Shandong Weifang Metal Logistics Co., Ltd light steel structure warehouse, 17000 SQM:
Type: Welded H-Section Steel
Forming: Hot-Rolled Steel
Crane:with or Without(1 to 50 Tons)
External Wall Design: EPS/ Rock Wool/ Polyurethane/ MGO/ Cement Foam Panel
Life Time of Steel Frame:More Than 50 Years
Packing Method: Flat Pack, Open Top Container, by Steel Skid, etc.
Raw Materials: Q235/ Q345
Door: Sliding Door, Roller Door, Steel Door etc.
Window: PVC, Aluminium( Sliding and Fix)
4. We found international surface treatment system for the steel construction buildings ( made of steel frame ) :
We got NACE 1 and 2 level certificate as per American standard.
We build professional enclosed shot blasting workshop, enclosed sand blasting room, 34000m2 fully-enclosed painting workshop and 20, 000 m2 enclosed packing workshop.
5. Our seaworthy packing system for steel construction buildings ( made of steel frame ) :
We found mature exporting packing and stuffing system:
With more than 300000tons exporting experiences, we adopt enclosed transportation to avoid damage to components caused by rough loading& unloading in delivery process. It not only guarantees components quality, but also saves the delivery cost for clients.
To improve the container delivery efficiency, we introduced advanced container stuffing equipment from Germany in 2012, which could make us finish one 40 feet container stuffing within 2 minutes.
6. FAQ:
1) How do we cooperate on certain project ?
Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal with Trade Assurance.
Project details, Drawings for your project, Revised drawings, Transaction confirmation.
2) What is the delivery time of steel construction buildings ( made of steel frame ) ?
Delivery time depends on order quantities. Generally, the delivery time will be 1-2 months after receiving deposit.
3) What' s your Payment term for the steel construction buildings ( made of steel frame ) ?
40% advance payment by T/ T, the balance before delivery.